2016 new synthetic rubber running track for primary shcool
2016 new synthetic rubber running track for primary shcool
2016 new synthetic rubber running track for primary shcool

2016 new synthetic rubber running track for primary shcool

USD $10.58 - $11 /Square Meter

Min.Order:1000 Square Meters

Supply Ability:
100000 Square Meter / Square Meters per Month
Port:
HuangPu port
Payment Terms:
T/T

Quick Details View All >

Place of Origin:
Hubei, China
Brand Name:
Yunzhijia
Model Number:
Breathable type
Sport:
Other, running track

Guangzhou Lvzhongxing Plastic Products Co., Ltd.

Business Type: Manufacturer,Trading Company
Shenzhen Guangdong China
Main Products: artificial grass ,rubber sports flooring ,breathable free plastic runway ,synthetic turf ,SI-PU stadium

Product Details

2016 new synthetic rubber running track for primary shcool
 
Product Description
 

Breathable freely type---

 

Characteristic:

 1,The standard thickness is 13mm, the color is mostly in red.

 2,The breathable running track has good water permeability and breathability, with non-foaming.It apply to being paving on old or new cement bases, then it reduces infrastructure costs. It is most economical and widely used material for tracks.

 3,It doesnt need daily maintenance,comprehensive use cost is ing life can be above 6 years.

 

Application:

 It is fit for school athletic field and small and medium enterpirse sports fields.

 

Property Index

  ITEM  INDEX
 Hardness  55
 Tensile strength  ≥0.7MPa
 Elongation rate at break  ≥91 %
 Compression recovery rate  ≥95 %
 Rebound resilience  ≥21 %
 Flame resistant property Grade

 1

 
Product Pictures
 
 
2016 new synthetic rubber running track for primary shcool
 
 
 

Sample

 

 

 

2016 new synthetic rubber running track for primary shcool

2016 new synthetic rubber running track for primary shcool

 


 


 

Successful case

 

2016 new synthetic rubber running track for primary shcool
2016 new synthetic rubber running track for primary shcool

2016 new synthetic rubber running track for primary shcool

2016 new synthetic rubber running track for primary shcool2016 new synthetic rubber running track for primary shcool 


  



The materials of breathable freely track

 

2016 new synthetic rubber running track for primary shcool

 

Construction Technology Process of Breathable freely plastic runway

 

 

 

1,In order to ensure bottom coating's perviousness, we should avoid construction in a condition of burning sun or under higher temperature(>450℃). If there is dew on the morning, it is not fit for construction too. Anyway the base surface should be dry before construction.
2,To clean the base surface, and do waterproof treatment to concrete surface after the surface totally drying. Using a roller to paint a layer of waterproof material. The recommended coverage per square is 0.2KG.The surface curing time is 24 hours.
3,After finishing solidifying, we prepare the high elasticity black colloidal particles with particle size of 3-4mm, mixed with high strength PU single glue. And the recommended proportion of those is 1:8. Then after mixing well, we pour them into pover. The laying thickness is 9-  10mm. And the recommended dosage of particles per square is 8KG, with 1KG glue per square. The solidity time is 24 hours.
4,The proportion of finishing paint A material on runway and B material is 1:3. And mixing them well for following use. Then mixing EPDM with particle size of 1-2mm and finishing paint well, with proportion of 1:1, then pour them into paver. Let spray gun's angle keep 60 degree for spraying. After finishing spraying, we need 24hour for solidifying&maintenance. Spraying the runway in the opposite direction again. The recommended dosage of finishing paint is 1.2kg per square, EPDM particles are 1.1kg per square, the catalyst is  0.012kg per square, then it still needs 24 hours to solidify.
5.After finishing for 24hours solidifying&maintenance, we can mark line on the ground, and the marking paint is 0.01kg per square.
6.Finishing construction of all progress, after 7days for maintenance for the runway, we can put it into use.

 

 

 

 

 

 
 
Company Information
 

LVZHONGXING  has developed into a modern cross-group which contains trade, research and manufacturing. Our company profession produces mixed type plastic runway, breathable freely plastic runway, EPDM plastic runway, SI-PU plastic stadium and acrylic plastic stadium.

 

The headquarters of LVZHONGXING is located in Wu Han city, Hu Bei Province, China. For providing better service to worldwide customers, the branch offices were set in Guang Dong, Yun Nan, Inner Mongolia etc. Since its establishment, we have been committed to providing pavement material of the field. To creat a brand by perfect quality and win markets by perfect sevices is our management tenent.

 

The company has been adhering to professional work, excellence, health and win-win opportunity. Strickly acdording to ISO9001(International Quality System Certification) and ISO14001(International Environment System Certification), we have done a good job in producing and tracking service, and won high reputation in the industry.

 

Our products are sold to Africa, Southeast Asia and Middle East and so on some countries, deeply general customers high praise. At present, sales and service network have been covering more parts of the world.

 

2016 new synthetic rubber running track for primary shcool


 
Shipment
 

2016 new synthetic rubber running track for primary shcool

 
Payment
 

2016 new synthetic rubber running track for primary shcool

 
Contact
 
Contacts :
 Olivia.zheng
Tel :
 0086-027-61905242
Phone :
 0086-15717176958
Fax :
 
Homepage:
 
 
 
FAQ
 

1) How can I place order?
A: You can contact us by email about your order details, or place order on line.

2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using.

3) What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.



 
 
Our Service
 

A: Your inquiry related to our products or prices will be replied in 24 hours.

B: Protection of your sales area, ideas of design and all your private information. 

C: Best quality and competitive price.

 

Contact Supplier

Address
Yundong Homeland, Futian District

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Sports & Entertainment > Artificial Grass & Sports Flooring
Categories
Hi~