BIHU brand golden 3 gang light switch flat panel good PC material
USD $0.56 - $1.28 /Piece
Min.Order:1000 Pieces
Shanghai BIHU Electric Appliance Co., Ltd.
high quality OEM manufacturing wall switch universal standard wall socket switch
best wholesale BIHU modular home 3 gang wall light pop up switch socket
super quality BIHU golden color PC electrical 2 gang touch light switch
New design high quality golden PC 1gang 1 way touch light switch
BIHU golden color PC panel wireless light 2 gang 2 way touch light switch
Our factory OEM UK, US, EU, Australia, India and universal standard wall socket and switch.
PARAMETERS | |
Material (panel) | PC ,stainless steel, aluminum, glass, acrylic |
Material (inner parts) | Sliver contact + copper parts |
Color | White, golden, silver |
Use Occasion | Residential , general use, commercial |
Size | 86*86mm(3.4*3.4 inches), 145*86mm(5.7*3.4 inches), 120*75mm(4.7*2.95inches) |
Type | UK, US, EU, Australia, India and universal standard |
Voltage | 110V, 250V |
Current | 10A, 13A, 15A, 16A, 20A, 45A |
USB outlet | 5V 2A, 5V 1A |
Specification | neon, USB, dual USB |
Data module | RJ45, double RJ45 |
Telephone module | RJ11, double RJ11 |
Function switch | dimmer, speed control, sound light delay, TV socket and more |
Lifetime | 15 years switch on and off |
Why choose us?
1. Golden and Assessed Supplier
2. Trade Assurance, With Trade Assurance, you'll enjoy:
duct quality protection
b.on-time shipment protection
c.payment protection for your covered amount
3. Professional manufacturer with more than 23 years' experience producing switch and socket
a. famous brand(BIHU switch and socket) in mainland China(over 50 offices at all province)
b. over 20 years assembling workers
c. new technical quality master model
duction systematic management
4. factory OEM, logo and packing can follow your requirement
5. Wholesale Low MOQS(accept small order), cheap freight charge
6. factory lowest price, we offer you good price help you save money
7. fast delivery and cheap shipping cost, we have our own forwarder(long contract), we have best discount on shipping cost.
8. Professional sales team provide your good service 24 hours online.
Little tips help you order | |
Standard | UK, US, EU, Australia, India or universal standard |
OEM | Print logo, customize package, color and material, please contact us online, OEM welcomed! |
Product HS code | switch: HS 8536500000 Socket: HS 8536690000 |
Price ( factory lowest price) | We are factory ( Address: NO. 1091 Yongxin Road, Jiading Area, Shanghai), ensure lowest price and good quality |
Service | We offer best service for you, please chat with us online |
MOQ ( accept small MOQ ) | small quantities will send via air |
Freight charge | Normally 100 pieces per carton, around 14kg/carton |
Production time | Sample : around 2 days send out samples after confirmation. Production: normally need 7-15 days, but depends on your order quantities. Small order will be less than 10 days. |
Need more information? | More products details, package ways, lowest price, please contact us (chat online or send email are all welcomed), it's our honor to service for you always |
Packing list | 1 product+2 screws per bag |
Packaging | 1 piece/bag, 10 bags/box, 10 boxes/carton |
OEM | Packing as your requirement |
Production Line and Assembling Line
Factory Outside Look and Warehouse
Our Office
BIHU at Exhibition, BIHU at Conference
Company Culture: annual travel
1. Can I ask for samples?
We can offer your free samples, but you need to pay the delivery expense, please ask our customer service for more detail.
2. What payment do you accpet?
Usually, we use T/T, but others will be used as well. We ask for 30% deposit, 70% is paid before delivery
3. What's your MOQ?
For the samples and product with BIHU logo, there is no MOQ. Without logo, MOQ is 10,000. With other logo or customized, MOQ is 10,000.
4. How long for OEM?
The OEM sample confirmation would be around 10 days, the production period may take around 45-60 days.
5. For customer service
Your inquiries will be replied by our experienced staff within 24 hours.