Track Roller Bearing LFR 5207-30 KDD
Negotiable /Piece
Min.Order:1 Piece
Shanghai Yinin Imp. & Exp. Co., Ltd.
Track roller bearing LFR 5207-30 KDD
SG15~SG35N series, LR series, LFR 50/5~LFR50/8,LFR5201~5208, series, V track ect.
Principal Dimensions(mm) | Bearing Designations | Basic Ratings | Mass(kg) | ||||||
d | D | c | B | dLW | D1 | Cr(N) | Cor(N) | ||
5 | 17 | 7 | 8 | 6 | 27 | LFR 50/5 KDD | 1610 | 890 | 0.01 |
8 | 24 | 11 | 11 | 6 | 34 | LFR 50/8 KDD | 4100 | 2280 | 0.02 |
12 | 35 | 15.9 | 15.9 | 10 | 51.3 | LFR 5201 KDD | 8500 | 5100 | 0.08 |
12 | 35 | 15.9 | 15.9 | 12 | 55.5 | LFR 5201-12 KDD | 8300 | 5000 | 0.08 |
12 | 42 | 19 | 19 | 10 | 58 | LFR 5301 KDD | 13000 | 7700 | 0.1 |
15 | 47 | 19 | 19 | 10 | 63.3 | LFR 5302 KDD | 14500 | 9200 | 0.17 |
20 | 52 | 20.6 | 22.6 | 16 | 79 | LFR 5204-16 KDD | 14600 | 9500 | 0.23 |
25 | 72 | 23.8 | 25.8 | 20 | 102 | LFR 5206-20 KDD | 23400 | 16600 | 0.25 |
25 | 72 | 23.8 | 25.8 | 25 | 112 | LFR 5206-25 KDD | 23100 | 16400 | 0.25 |
30 | 80 | 27 | 29 | 30 | 132 | LFR 5207-30 KDD | 28500 | 20800 | 0.66 |
40 | 98 | 36 | 38 | 40 | 155 | LFR 5208-40 KDD | 38500 | 29000 | 1.36 |
Shanghai YiNiN Bearing | |||
YNN Bearings is a leading bearing exporter & manufacturer with a wide range of Bearings & related components, we're committed to providing our customers with only the best service. | |||
Brand | YNN or OEM service | ||
Name | Shanghai YiNiN Bearing | ||
Model | Track roller bearing | ||
Material | chrome steel,stainless steel | Certificate | ISO9001:2008,ISO/TS16949 |
Precision | abec-1, abec-3, abec-5, abec-7, abec-9 | ||
Bore Size | 1-1000mm | Outside diameter | 3-3000mm |
Clearance | Co, C2, C3, C4 | ||
Cage Type | Steel Cage,Brass Cage,Nylon Cage etc. | ||
Seals Type | Shielded, Sealed | ||
Features | The bearings have low friction and very little noise or vibration, These characteristics make them to be available for situations of high speed, high precision, low friction and low noise operations. | ||
Application | widely used in winding machine, linear guide, Agriculture, Automotive, Chemical, General industrial. | ||
Package | pallet, wooden case,industrial package or as customers' requirement | ||
Price | USD,EUR,RMB(FOB, CFR, CIF) | Delivery Time | 5-20 days |
You can always count on us !!