High Grade EPS Foam Cutter
USD $10,000 - $15,000 /Set
Min.Order:1 Set
Fuyang Longwell Imp. & Exp. Co., Ltd.
High Grade EPS Foam Cutter
Advantage:
-1 year quality guarantee, spare part for free
-2 engineers go to install EPS production line
I. EPS block production line mainly includes three parts:
1. EPS pre-expander: it’s used to make EPS raw material to foamed beads
2. EPS block molding machine: it’s used to make foamed beads to foam block.
3. EPS cutting machine: it’s used to cut the big foam block to small size you need.
Flow chart
A.EPS pre-expander
It turns eps raw material (expanded polystyrene) to big and light foam beads through steam
heating. With PLC and touch screen to realize full automatic production for feeding, heating
and ejecting foam beads.
ITEM | HPS-11100B | |
Expansion Chamber | Diameter | DN1100 |
Volume | 1.4m3 | |
Usable Volume | 1.0m3 | |
Steam | Entry | DN50 |
Consumption | 6-8kg/cycle | |
Pressure | 0.6-0.8Mpa | |
Compressed Air | Entry | DN25 |
Consumption | 0.9-1.1m3/cycle | |
Pressure | 0.5-0.8Mpa | |
Drainage | Upper Drain Port | DN100 |
Down Drain Port | DN100 | |
Material Conveying Line | DN150 | |
Capacity | 10.5g/l 350kg/h | |
15g/l 580kg/h | ||
20g/l 800kg/h | ||
30g/l 950kg/h | ||
Connected Load/Power | 19.5KW | |
Expanded Density | 10-40kg/m3 | |
Density Tolerance | <±2% | |
Overall Dimension | 2900*4500*5900(mm) | |
Weight | 3200k |
B. EPS Block Molding Machine
It makes eps foam beads to big foam block through steam heating and air cooling. With PLC
and touch screen to realize full automatic production for feeding, heating, vacuum cooling, mould
opening, mould closing and ejecting the foam block.
C. EPS cutting machine
It cuts the big foam block to small size with electricity hot wire, can cut in 3 direction: Horizontal, vertical, Lateral.
Details of High Grade EPS Foam Cutter
Application of High Grade EPS Foam Cutter
1. Take our valued client as priority, make sure equipment quality and answer clients’ questions anytime and anywhere.
2. Customizing machines according to clients' needs, such as different design, different brand parts, different colors, more function and etc
3. Engineers go to clients' factory to install machines in time.
4. More spare parts given to clients for free to ensure the factory working without suddenly stop
Q: Does your machine have CE certification?
A: Yes,our machine with CE certification.
Q: How about payment terms?
A: 30% TT deposit + 70% TT before shipment,50% TT deposit + 50% LC balance, Flexible payment can be negotiated.
Q: Installation and commissioning?
A: We will send our engineer for installation and commissioning, but relevant cost will be paid by you.
Q: Do you have some videos where we can see the line producing?
A: Yes, we can provide some videos for reference.
Contact: Vicky Wu
Mobile: +8613758164390
Skype: vicky19862
Wechat: 108895932