High efficiency Coiled Tubing Unit

High efficiency Coiled Tubing Unit

Negotiable /Set

Min.Order:1 Set

Supply Ability:
30 Set / Sets per Month
Port:
Tianjin Shanghai
Payment Terms:
T/T

Quick Details View All >

Condition:
New
Transmission Type:
Automatic
Fuel Type:
Diesel
Dimensions (L x W x H) (mm):
12000*2550*4000(mm)
Gross Vehicle Weight:
54000
Place of Origin:
China

Sinotai Petroleum Equipment Co., Ltd.

Credit Member 4 years
Business Type: Trading Company
Shandong China
Main Products: Petroleum Equipments

Product Details

Specifications

1.Delicate architecture,
2.Convenient transportation
3.Beefy cross-country capability,
4.Comfortable operation

Coiled Tubing Unit

Product Explanation:

The character of coiled tubing unit is as follow: delicate architecture, convenient transportation and installation, beefy cross-country capability, comfortable operation, large volume capacity, strong lifting ability and so on which make coiled tubing unit suitable for complex operational mode and road transport.

Technique Features:

1.Integrated design, delicate architecture, small turning radius, high operation efficiency, met little well site and fast installation/disassemble. 
2.Chasses with sectionalized frame is assembled and welded with high intensity hot rolled steel plate, which is light and big load capacity; chassis is full wheel drive and cross-country capability is strong.
3.Elevating control cabin can clearly observe the coiled tubing and the injector head above well. All-weather assembled control room supplies clear and comfortable surrounding with high level insulation, HV (forceful electric power)/ electronic control board, advanced air-condition.
4.Elevating drum can in the frame of truck when normal running; maximal height of transportation is no more than 4m with nominal hang equipment and minimum ground clearance can raise from 200mm to 600mm under complicated road conditions, which improve noticeably adaptability. 
5.Drum is driven by hydraulic pressure, and it only needs to replace three top rolls of racker roller, injector head holder and gooseneck, then 1”~2 3/8’’ tubing may be applied. These replacement units is humanity, simple and quick, low labor intensity .
6.Advanced injector head with four chains has terse architecture and strong lifting ability; and four chains construction can decline effectively coiled tubing deformation during injection process. Two tandem injector heads can meet complex well condition under special necessary surrounding. 
7.Injector head and related pressure control unites lies beside of the truck and coiled tubing is in injector head from start to finish under transportation environment.
8.Chasses has passed the quality of 3C, and injector head, control cabin have passed the quality of ATEX and met well site explosion proof demand which have high safety. 
9.SmartMonitor control system is adopted, performance is steady and maintenance is convenient.

 Main Technical Parameter:

Item

Parameters

Max.Capacity(1.25”CT,m)

11,280

(1.5”CT, m)

7,640

(1.75”CT,m)

5,570

(2” CT,m)

4,260

Drive mode

8×8

Engine Power

300kW/2100rpm(400hp/2100rpm)

Outside Dimensions(L×W×H)

12.0×2.55×4.00m

Whole Quality kg

54,000

Max Speed of Truck km/h

83

Max.climb Angle(Full Load)(%)

45

Approach Angle (°)

26

Departure Angle (°)

16

Ground Clearance(DrumLifting mm)

320

(Normal Speed Condition mm)

200

Min.turning diameter m

32

Work Temperature

-40°C-+50°C(-4°F-20°F)

 

High efficiency Coiled Tubing Unit

Contact Supplier

Ms. Herish Kuo Vice General Manager Chat Now
Telephone
86-546-8300512
Mobile
18654653153
Fax
86-546-8308512
Address
No.67 Fuqian Road Shandong

You May Like

New Products

Find Similar Products By Category

Transportation > Truck > Other Trucks
Categories
Hi~