225kva 180kw 50hz 3 phase diesel generator with volvo TAD733GE engine
USD $21,200 - $23,000 /Set
Min.Order:1 Set
Shenzhen Horlion Machinery Co., Ltd.
Product details
225kva 180kw 50hz 3 phase diesel generator with volvo TAD733GE engine
Engine
Engine Model | TAD733GE |
Engine manufacturer | VOLVO |
Number of Cylinders | 6 cylinders |
Cylinders arrangement | Vertical in LINE |
Cycle | 4 stroke |
Aspiration | Naturally |
Bore×Stroke | 108mm x130mm |
Displacement | 7.15L |
Compression ratio | 16.5:1 |
Prime Power/Speed | 197KW/1500rpm |
Standby Power/Speed | 197KW/1500rpm |
Speed Governor | electrical |
Cooling System | Forced water cooling cycle |
Steady speed droop | ≤1% |
Total lubrication system capacity | 34L |
Fuel Consumption at 100% Load | 201 g/kw.h |
Starter Motor | DC24V, |
Alternator | AC24V |
225kva 180kw 50hz 3 phase diesel generator with volvo TAD733GE engine
Alternator
Alternator brand | Stamford, Marathon, Leroy Somer, Mecc-alte, TWGII… |
Prime power | 180Kw |
Frequency/speed | 50HZ/1500rpm (60Hz/1800rpm) |
Exciter type | Single bearing, Brushless, Self-excited |
Power factor | 0.8 |
Voltage adjust range | ≥5% |
Voltage regulation NL-FL | ≤±1% |
Insulation Grade | H |
Protection Grade | IP23 |
Control panel
Brand | Deepsea/ComAp |
The control module gives digital readouts of: Generator voltage; Output frequency; Engine speed; Battery voltage; Engine hours run. The control module has indicators for failure information: Overspeed/underspeed, Emergency stop Low oil pressure; High water temperature Failure to start Battery charger failure Automatic shutdown occurs under: Low engine oil pressure; High engine water temperature; Overspeed/underspeed; Failure to start after three attempts. |
|
Optional-addtional parts
Engine | Fuel System | Cooling system | Exhaust system |
Coolant Heater Lube oil heater Electronic governor Engine oil temperature | External Tank Water Separator | 50-60 Radiator, Remote radiator Cooling tower | Heavy Duty air filter Silencer Enclosures |
Alternator | Control System | Others | Voltage Connections |
Anti Condensation Heater Permanent Magnet Generator-PMG Drop CT-for paralleling | Remote Control Panel Auto Transfer Switch ATS-Control Panel Paralleling System Electricity Output Cabinet | Rainproof Type Soundproof Type Containerized Type Trailer Type Spare Parts | 480/277V 440/254V 416/240V 400/230V 380/220V 240/139V 220/12 V 208/120V |
High Voltage of 6.3kv, 6.6kv, 10.5kv, 13.8kv etc are available |
The following Genset spare parts of engine brands, alternator brands and Control panel for optional
Rated power | Engine | Alternator | Control panel |
20kw~1300kw | Stamford Leroy somer Marathon Mecc alte ABB Chinese alternators | Deepsea ComAp Harsen Smartgen | |
8kw~1600kw | |||
68kw~504kw | |||
20kw~500kw | |||
220kw-2400kw | |||
280kw-800kw | |||
600kw-1800kw | |||
50kw-650kw | Doosan Daewoo | ||
2kw~2500kw |
1). Guarantee period: one year or one thousand hours, take the first as standard.
2). Any trouble of breakdown caused by installation, design or material, we will take charge of the repairment
3). Any trouble or breakdown of the easily damaged parts and other parts which caused operation or no maintenance will not included in the guarantee, but we offer spare parts with cost price, and our engineers can help to repair the generator to work again.
Industry Standard:GB1105/GB2820
International Standard:ISO9001:2000
Generator type
Open Type but not contains Base fuel Tank
Soundproof Enclosure Type
Portable Silent Type
Portable canopy Type
Control Panel
Standby Use: Shopping Mall,Factory,Office Buliding,Bank,Farms,Hospital,School etc,any places
need backup power;
Prime Use:Oil Field,Road Construction,Mining etc,any places without City Power.
Trade Terms:EXW,FOB.CFR,CIF,DDU.
Payment Term: 30%TT as deposit,70%TT before Shipment.
Delivery Time: 3-15 working days.
Packing:Plywood Pallet,Plywood Case,Plastic Film.
Shipping Port:Shanghai,Ningbo,Qingdao etc.
Presale: Expert engineers offer technical consultation and assort guidance to our customers, such as choose the generator type, assort, design the generator room, and so on. To solve any questions and offer technical help during any time.
Onsale: Once we get inform from our customer, we send technical engineers to scene and help to installation and debug the generator, and cooperate with customer to check and accept the generator.
After-sale: 1. Design machine room and the power distribution of the generator.
2. Installation and debug the generator.
3. Train the technical engineer of operating and the maintenance for the customer.
4. Establish record system and offer follow-up service and regular inspection.
5. Offer spare parts and technical help at any time.
Q: choose the power?
A: Collect all power of your equipments,take the surge current into your consideration.
Q:pick up the engine brand?
A: International Engine brands for genset have reliable quality,such as Cummins,Perkins,Doosa,MTU,Deutz,Volvo Penta etc,some chinese engine have good quality too,such as Yuchai,Shangchai,VMAN,Wudong etc.
Q: the difference between Prime power and Standby Power?
A: Prime power is 12 hours continuous power,Standby Power is 1 Hour peak power.
Q: set the Generator Room?
A: Our Sales can offer the technical suggestions according to the customer's actual situation.
Q: Warranty Service?
A: All our generators enjoy 1 Year or 1000hours Warranty time.We can offer the new parts to replace the broken parts within the warranty period.