5CrNiMoV mould steel
USD $2,000 - $3,000 /Metric Ton
Min.Order:3 Metric Tons
Shenyang Zhongjin Mould Steel Co., Ltd.
1.ISO9001:2008 certificate
2.Competive price and Best quality
3.On-time delivery
Chemical Composition%(GB)
C | Si | Mn | Ni | Cr | Mo |
0.49-0.54 | 0.2-0.3 | 0.95-1.05 | 1.95-2.10 | 0.95-1.10 | 0.45-0.55 |
Characterstics
1.High toughness and strength | |||||||
2.Higher abrasion resistance | |||||||
3.Remaining hardness of HB300 at 500℃ | |||||||
4.Insensitive to tempering brittleness due to addition of Mo |
Applications: Suitable for large and medium sized forging dies with thickness of 250-350mm for automobiles,tractors,transmission gears,front axle beams and rear axles of automobiles,and forging dies for engineering machine components
Own factory and found heat treatment workshop in 2006
We can offer the competive price and best quality
The biggest processing and distribution center of mould steel in Northest region
Tool Steel | GB(China) | ASTM(USA) | JIS(Japan) | DIN(Germany) |
High Speed | W6Mo5Cr4V2 | M2 | SKH9 | 1.3343 |
Cold work | T10A | W110 | SK3 | 1.1645 |
9CrWMn | O1 | SKS31 | 1.251 | |
Cr8 | - | - | - | |
Cr12MoV | D3 | SKD11 | 1.2601 | |
Cr12Mo1V1 | D2 | SKD11 | 1.2379 | |
Cr8Mo2SiV | - | DC53 | - | |
Cr12 | D3 | SKD1 | 1.2080 | |
GCr15 | 52100 | SUJ2 | 100Cr6 | |
40Cr | 5140 | SCr440 | 1.7035 | |
Hot Work | 4Cr5MoSiV1 | H13 | SKD61 | 1.2344 |
5CrMnMo | 6G | SKT3 | 1.2311 | |
5CrNiMo | L6 | SKT4 | 1.2713 | |
5CrNiMoV | - | - | 1.2714 | |
35CrMo | - | SCM435 | 1.7220 | |
42CrMo | 4140 | SCM440 | 1.7225 | |
Plastic | 3Cr2Mo | P20 | PDS5 | 1.2311 |
3Cr2MnNiMo | P20+Ni | PDS5S | 1.2738 | |
4Cr13 | 420 | SUS420J2 | 1.4034 | |
10Ni3MnCuAl | P21 | NAK80 | - | |
2Cr13 | 410 | SUS410 | 1.4021 | |
Mild Carbon | 45# | 1045 | S45C | 1.1191 |
cold working die steel hot working die steel plastic mould steel
1.Who are we?
We are a professional manufacturer in alloy steel since 2006.
2.What is the minimum order quantity?
Our minimum order is 100 pieces or 3 metric tons.
3.What is the production lead time?
Usually the lead time is 20-30 days after order be confirmed.
But for the exact date,please check with our sales team.
4.Why choose us?
We can offer the best quality and competive price.