D2 steel price per ton hot rolled steel plate metal plate
USD $500 - $1,000 /Metric Ton
Min.Order:5 Metric Tons
Shenyang Zhongjin Mould Steel Co., Ltd.
D2 steel price per ton hot rolled steel plate metal plate
Equivalent Grade | Chemical Composition(%) | |||||||||
C | Si | Mn | Cr | Mo | V | P | S | Co | ||
China/ GB | Cr12Mo1V1 | 1.4~1.6 | ≤0.6 | ≤0.6 | 11~13 | 0.7~1.2 | ≤1.1 | ≤0.03 | ≤0.03 | ≤1.1 |
USA/ASTM | D2 | 1.4~1.6 | 0.1~0.6 | 0.2~0.6 | 11~13 | 0.7~1.2 | 0.5~1.1 | ≤0.03 | ≤0.03 |
|
Germany/DIN | 1.2379 | 1.4~1.6 | 0.6 | 0.6 | 11~13 | 0.7~1.2 | 1.1 | 0.03 | 0.03 | 1 |
Japan/JIS | SKD11 | 1.4~1.6 | ≤0.4 | ≤0.6 | 11~13 | 0.8~1.2 | 0.2~0.5 | ≤0.03 | ≤0.03 |
Characteristics:High hardening ability and quench-hardening performance,high abrasive resistance,good oxidation resistance at elevated temperatures,less deformation after heat treatment.
Main Applications:Suitable for various complicated cold working dies with high precision and long lifetime,such as punching dies,cold ,extrusion dies,thread rolling dies,screw plates,cold extrusion dies and precise measuring devices
Cold Working Die Steels | ||
CH-1 | D3M | SKD11 |
Hot Working Die Steel | ||
5CrMnMo | 5CrNiMo | H13 |
Plastic Mould Steel | ||
P20 | 718 | NAK80 |
1.Who are we?
We are a professional manufacturer mould steel for 9years.
2.What is the minimum order quantity?
Our minimum order is 100 pieces or 3 metric tons.
3.What is the production lead time?
Usually the lead time is 20-30 days after order be confirmed.
But for the exact date,please check with our sales team.
4.Why choose us?
We are the manufacturer so can offer the best quality products and competive price.
5.Any other requirements or questions please contact us.
steel plate| steel plate| steel plate| steel plate| steel plate