Euro CE standard AC three phase 90kw biomass gasification power generation
Euro CE standard AC three phase 90kw biomass gasification power generation
Euro CE standard AC three phase 90kw biomass gasification power generation
Euro CE standard AC three phase 90kw biomass gasification power generation
Euro CE standard AC three phase 90kw biomass gasification power generation
Euro CE standard AC three phase 90kw biomass gasification power generation

Euro CE standard AC three phase 90kw biomass gasification power generation

USD $27,000 - $29,000 /Set

Min.Order:1 Set

Supply Ability:
30 Set / Sets per Month
Port:
Qingdao Port
Payment Terms:
T/T Credit Card

Quick Details View All >

Place of Origin:
Shandong, China
Brand Name:
LVHUAN
Model Number:
LHBMG90
Output Type:
AC Three Phase
Speed:
1500r/min
Frequency:
50/60Hz

Shandong Lvhuan Power Equipment Co., Ltd.

Business Type: Manufacturer
Shandong China
Main Products: Biogas Generator Set ,Natural Gas Generator Set ,Coal Mine Gas Generator ,Diesel Generator Set

Product Details

Specifications

biomass gasification power generation
1. CE/ISO9001/ISO14001
2. Low consumption
3. Long life time
4. Low operation cost

1. Company Introduction

2. Advantage

3.Requirements For Biomass Gas Genset Working Condition

 

 Within 1m from pressure regulating valve of gas intake

 

4. Parameter of 90kw Biomas gas generator set

Model

LHBMG40

Standard

JB/T9583.1-99

Engine model

LH6135

Alternator model

Brushless /IP23/3PH 4Wire)

Machine power

72KW/90KVA

Rate voltage

400V / 220V (adjustable)

Rate frequency

50/60Hz

Rate power factor

0.8

Rate speed

1500r/min

Speed regulation mode

Automatic

Voltage regulation mode

Automatic 

Operation model

Auto/Manual

Cooling mode

Open/close water cooling

Start mode

24V DC electric motor

 

5. Parameter of 90kw Biomas gas engine

 

Engine mode

LH6135

Sparking mode

Sparking pl

Gas mixing type

IMPCO

Heat Consumption

≤10MJ/kW.h

Cylinder number&type

Link

EGT

≤650℃

Cylinder diameter

135mm

Stroke

150mm

Displacement

12.80L

Lubrication 

Pressure and splash

Rate speed

1500r/min

Cooling model

Open/closed water cooling

Emissions targets

EU 

Noise

≤105dB

 

6. More pictures of our equipment

 Euro CE standard AC three phase 90kw biomass gasification power generationEuro CE standard AC three phase 90kw biomass gasification power generationEuro CE standard AC three phase 90kw biomass gasification power generation

7. Visitors

Euro CE standard AC three phase 90kw biomass gasification power generation

8. Our factory and workshop

Euro CE standard AC three phase 90kw biomass gasification power generation

9. Project Cases

Euro CE standard AC three phase 90kw biomass gasification power generation

10. Certificate

Euro CE standard AC three phase 90kw biomass gasification power generation

 

11. Service 

 

1.pre-sale service:

 

(1)We will send our engineer to prospect the site of power station free to charge.

 

(2)According to the situation of site we can supply you many drawings:like power station floor plan,

engineering flow sheet of circle cooling system,genset installation,genset foundation,electrical connection and some other techincal support etc.

 

2.Sale service:

 

(1)we will send our engineer to the site to guide you the installation of generator set, subsystem and relative equipment.

 

(2)We will debug the generator set till it can generate power successfully.

 

(3)We will also supply a technical training to the operators.Orcan send your staff to our company.We can train you till you can operate the generator set.

 

3.After-sale service:

 

(1)Our every engineers are in charge of different area,we will response periodically and support you 

technical service free of charge,

 

(2)For the quality problem, we will service for you free of charge during the guarantee period.

 

(3)One year guarantee period and lifetime service.

 

(4)we solve quality problem in time when genset doesn’t work,We insure to help our clients to gain the biggest economic profit.

 

12. Accessories

 

1.Application scope of the Accessories,such as 12v190,8v190,6190,6135 and other engine types.

 

2.All parts were from original factories or professional factories,complete in specification,keep good quality.

 

Euro CE standard AC three phase 90kw biomass gasification power generation

Sincerely welcome to visit our factory and build future cooperation relationship. Helping our customer generating electricity is our purpose.

Contact Supplier

Ms. Selena Wang manager Chat Now
Telephone
86-531-62337767
Mobile
86-13964142686
Fax
86-531-88887575
Address
High-Tech Industries Development Zone Jinan City, Shandong,China Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Electrical Equipment & Supplies > Generators > Gas Turbine Generators
Categories
Hi~