Fiberglass Ceramic Fiber Tape For Boiler Thermal Insulation
USD $4.15 - $4.3 /Kilogram
Min.Order:1000 Kilograms
Fiberglass Ceramic Fiber Tape For Boiler Thermal Insulation
PRODUCT DESCRIPTION | Ceramic fiber tape are produced by processing refractory ceramic fiber yarn. Insert materials are incorporated into the yarn to increase fabric tensile strength.Ally wire insert are available for obtaining maximum strength at elevated temperatures.Glasses filament insert are used in applications where electrical resistance is required.
|
PRODUCT FEATURES
|
Good handling strength Low thermal conductivity and heat storage Excellent thermal shock resistance Easy machining Low weight Elastic Flexible Excellent hydrophobic property Smooth surface and anti-tearing
|
PRODUCT APPLICATION
| Gasket and wrapping material |
TECHNICAL DATA:
Classification temperature | 1260(2300℉) | |||
Product | 1260(2300℉) Ceramic fiber cloth | 1260(2300℉) Ceramic fiber tape | ||
Service temperature(ºC) | 500-600 (932-1112℉) | 1000 (1832℉) | 500-600 (932-1112℉) | 1000 (1832℉) |
Basic material | Ceramic fiber | Ceramic fiber | Ceramic fiber | Ceramic fiber |
Reinforced material | Fiberglass Filament | Stainless steel Filament | Fiberglass Filament | Stainless steel Filament |
Theoretical density(kg/m3) | 500±15 | 500±30 | ||
Specification(mm) | 30000x1000x2/3 | 30000x25/50/75x2/3 | ||
Moisture content(%) | ≤2 | |||
Warp density | 48-60piece/10cm | |||
Weft density | 21-30piece/10cm | |||
Delivery state | Roll | |||
Organic content(%) | ≤15 |
OUR COMPANY:
FAQ:
1.What is your MOQ?
A:MOQ may vary by customer's special requirement; we try our best to meet your business requirement.
2.Can you provide sample?
A: Yes, we can offer sample , and some samples are free
3. Can you delivery by express?
A: Yes, we can delivery by any express
4. Can you accept OEM ?
A:YES! We can according your demand to produce.
5. How to solve the quality problems?
A:If the products are not conform to customer samples or have quality problems, our
company will be responsible.
6. what‘s your regular practice concerning terms of payment?
A: Payment terms :T/T 30%-50% deposit after order confirm ,the balance after goods ready before shipping or L/C, or Western Union for small amount. Or PAYPAL.
7. How long does it usually take you to make delivery?
A: Lead time: Normally about 10 days after deposit received.