Non solidify rubber bitumen waterproofing coating/paint
USD $1,000 - $3,500 /Ton
Min.Order:1 Ton
Weifang Choice-Link Trading Co., Ltd.
Non solidify rubber bitumen waterproofing coating/paint
Non solidify rubber bitumen waterproofing coating/paint is the new waterproofing material which is newly developed by our company. This product is one component waterproofing coating be made by some modified materials, it is composed of rubber powder, high polymer and bitumen etc.
Non solidify rubber bitumen waterproofing coating/paint can exposed to air for long time, non solidify, insoluble in water, very sticking, it was suitable the work surface to be complex specially, the coating can self-acting find and fix the leaking position.
Non solidify rubber bitumen waterproofing coating/paint has the outstanding creep properties, good waterproofing performance and aging resistance. Applying of this product including plastering, spraying or slip casting etc. This coating can be used to made composite waterproofing membrane with others membrane and also using for a independent waterproofing layer.
1. Excellent creep properties
2. Excellent bonding performance
3. Excellent self-healing property
4. Excellent wet construction at the grass-roots level
5. Excellent resistance to chemical corrosion resistance and aging resistance
6. Superior environmental performance
For important waterproof engineering, edible pool, aquaculture, special pool, swimming pool, water pipes, with requirements of environmental protection waterproof engineering on groundwater, etc.
1.Can be exclusive used or can be used with other waterproof coiled materials.
2.The coating is dry and not re-sticky after curing;
3.Not containing toxic and harm solvents like methylbenzene, di-methylbenzene, tri-methylbenzene, etc;
4.Not containing volatile solvent and strong smell;
5.For immediate use, it is convenient to use and can be flame plating and shelling-out;
6.Good function of physical mechanics, satisfying all indexes of typeⅠandⅡwaterproof coating.
7.The time of drying and curing is obvious shorter than national standard, which is good for construction stage;
Base Course Requirement:
The base course should be clean, solid, smooth, no dust, grease and water.
1.Coating construction is generally 3~4 times, scraping and coating on the base course evenly with a rubber scraper or bristle brush after stirring. The first time coating film should be thin in order to prevent bubbling.
2.The construction protect layer must be done upon coating thickness had met the design requirement and gained acceptance.
3.Coating can be carrying on as soon as the prior film is non-stick.
4.In order to cohering the waterproof layer and other materials, you can add some coarse sand before the last coating becoming non-sticky under facade construction.
5.The direction of the prior and the next coating should be vertical and repeated for many times to make sure that the coating is completely saturating and cohering the base course. The second time coating can be carrying on as soon as the prior film is non-stick.
6.In order to cohering the waterproof layer and other materials, you can add some coarse sand before the last coating becoming non-sticky under facade construction.
7.The construction protect layer must be done upon coating thickness had met the design requirement and gained acceptance.
*Do not construct under 5°C.
*Add a certain proportion of drier to ensure the curing time in low temperature. (Please ask technical support department for details.)
*Please wear protective clothing when you are working in order to avoid the coating contacting skin and eye. Keep ventilate.
*The coating must be tightly preserved if not running out.
*Do not construct in sleet and sand blown by the wind. Avoid constructing in high temperature at noon (prevent the coating bubbling and becoming sticky to feet).
*The products should be sealed storage in ventilated and shade place. Keep away from fire. Prevent sun and rain during transportation.
Transportation and packaging:
*It must be stored in cool, dry and ventilated space.
*Avoid raining, insolating, squeezing and colliding during transportation to save the packaging.
We produce SBS/APP modified bitumen waterproofing membranes, Self adhesive bitumen waterproofing membranes, Self adhesive bitumen flashing tape, Self adhesive butyl waterproofing tape, PVC/TPO/HDPE/EVA waterproofing membranes, Polymer compound waterproofing membrane, Liquid bitumen coating, etc, our company also export Non woven polyester mat for bitumen membranes, Glassfiber mesh compound mat for bitumen membranes, Glassfiber mesh, Modified bitumen membrane production lines, etc
Our products are sold in over 20 countries all over the world. Approximately 70% of the total produced materials are supplied to the China market while the remaining 30% are exported to European countries, Middle East, South East Asia, South American and U.S.A.
Honest is our business policy, quality and service first. The key of the successful activity in the high quality of research and controls before, during and after production.