roll forming machine rolling shutter door frame steel door in botou
USD $4,000 - $40,000 /Set
Min.Order:1 Set
Cangzhou City Tianyu Machinery Manufacture Co., Ltd.
roll forming machine rolling shutter door frame steel door in botou
Main Accessories of 1.5mm galvanized steel metal door frame forming machine
1 | Decoiler(manual or hydraulic for options) | 1 set |
2 | Feeding device | 1 set |
3 | Main Forming Machine | 1 set |
4 | Hydraulic step press device | without |
5 | Hydraulic cutting device | 1 set |
6 | Hydraulic Station | 1 set |
7 | PLC computer control system | 1 set |
8 | 4m Run Out Table | 1 set |
specification of 1.5mm galvanized steel metal door frame forming machine
No. | Iron Door Frame Roll Forming Machine | |
1 | Suitable material | color steel sheet, galvanized steel sheet, aluminium sheet |
2 | Material width | 1250mm or as your required |
3 | Material thickness | 0.3-0.8 or as your required |
4 | Working speed | 8-12m/min, can be 20m/min |
5 | Main motor power | 5.5kw with cycloidal with reducer |
6 | Hydraulic pump power | 4kw |
7 | Electrical control system | PLC control system with inverter |
8 | Shaft diameter | 70mm |
9 | Roller station | 16 rows, depend on your panel profile drawing |
10 | Roller | high grade 45# steel, hard chrome plating |
11 | Working time | 24 hours |
12 | workers | 1-2 only |
13 | Cutting head material | Cr 12 mould steel with quenched treatment |
14 | Voltage | 380V 3Phase 50Hz or as your required |
15 | Weight | 4.5T |
16 | Dimension | 685mm*15mm*15mm |
Production process
machine show and some deatils
FAQ about roll forming machine :
Q:How is this machine's service life?
A:In the normal maintenance,the service life at least 8 years.
Q:How to maintenance?
A:If using frequently,best coating lubricant on the chain and two ends of the shaft every month,replace the hydraulic oil every 1-2 years.
Q:What can you do if the machine broken?
A:Our machine's warranty period is 1 year,if the broken parts can't repair,we can free send the new parts replace the broken parts to you except the solenoid valve,the solenoid valve you must pay the express cost yourself.if after warranty period,we can through negotiationfor to solve the problems,and we supply the technical support for the whole life of the equipment.
Q:Can you be responsible for transport?
A:Yes,please tell me the destination port or address.we have rich experience in transport.
Q:Miss Alice,can you make the machine according to my design or proto type?
A: Yes. We have an experienced team for working out the most suitable design and production plan for the machine that you are going to book with us.
Q:How many workers operate this machine to manufacture?
A:Only 1-2 worker.
Q:Can you supply the raw materials?
A:Yes,we can supply the galvanized steel coil,galvalume steel coil,color steel coil,and aluminum coil.
Need my help now?I am here for you,my friend