200L beer making machine/micro beer brewing equipment/brewhouse system
USD $31500.00 - $31500.00 /Set
Min.Order:1 Set
Jinan Rainbow Machinery Co., Ltd.
200L Conical beer fermenter/craft beer brewery equipment/micro beer brewery
Specifications
1. Two or three vessels brewhouse:
mash/lauter tank, kettle/whirlpool tank
mash/brew kettle, lautering tun/whirlpool
2. Steam or electric heating,
3. Six fermenters
4. CIP Cleaning system
5. Cooling compressor and glycol tank
6. PLC/semi-auto controlling system, seperate control for each fermenters
Here follows is the parameter of 200l brewery, please check for reference.
Items | Equipment | Specification | Quantity |
Malt miller | Malt miller | 200kg/hour | 1 |
Brewhouse system | Mash tun&lautering tun | 200L | 1 |
Brew kettle&whirlpool | 200L | 1 | |
Hot liquid tank | 200L | 1 | |
Wort oxygenator |
| 1 | |
Plate heat exchanger | 2m² | 1 | |
Pump | 3m³/h | 2 | |
Working platform |
| 1 | |
Fermentation system | Fermenter | 300L | 6 |
Yeast adding tank | 10L | 1 | |
Cooling system | Glycol water tank | 500L | 1 |
Cooling compressor | 3hp | 2 | |
Pump | 3m³/h | 1 | |
Filter system | Kieselguhr filter machine |
| 1 |
Brite beer tank |
| 1 | |
CIP washing system | Alkali tank | 30L | 1 |
Sterilization tank | 30L | 1 | |
Pump | 3m³/h | 1 | |
Control system | Digital display controlling system | 1 | |
Spare parts | All spare parts | ||
Heating source: electricity, gas fired heating or steam Material: stainless steel 304 or copper Warranty period: 36 months for main equipment Brewhouse system: 1) Inner wall SUS 304, 3mm; surface wall 1.5mm stainless steel 304 or copper 2) inside polishing 0.4-0.6 micron 3) dome top, side and top manway 4) insulation: polyurethane/rockwool 100mm; with inside washing ball, agitator, false bottom 5) Tangential inlet for whirlpool Thermowell for temperature sensor and thermometer.... 6) butterfly valves, clamps and gaskets Fermentation system: 1) Inner wall SUS 304, 3mm; surface wall 1.5mm stainless steel 304 2) Dome top, conical bottom, top/side manway 3) Insulation: polyurethane 100mm 4) Glycol cooling jackets on both cylinder and cone, SUS304 1.5mm 5) Inside 360 degree CIP washing ball; Inside polishing 0.4-0.6 micron automatic pressure relief 6) with thermowell and pressure sensor&gauge safety&vacuum valve sample valve 3 legs with adjustable bolts |
Equipment | Components |
Malt Miller | Double roller type miller |
Brew House System
| Mash/lauter tun, brew kettle/whirlpool tank, hot liquid tank |
Inner wall: 3mm SUS 304; outer wall: brushed SUS 304; insulation: 100mm PU; inside polishing 0.4um; dome top with manhole; rotating CIP washing ball; thermowell for temperature sensor and thermometer | |
Fermentation System
| Beer fermenter tank |
Inner wall: 3mm SUS 304; outer wall: brushed SUS 304; insulation: 100mm PU; inside polishing 0.4um; dome top with conical bottom; rotating CIP washing ball; thermowell for temperature sensor and thermometer; pressure sensor and gauge | |
Yeast adding tank | |
Cooling System
| Glycol cooling tank |
Inner wall: 3mm SUS 304; outer wall: brushed SUS 304; insulation: 100mm PU; inside cooling tube | |
CIP Washing System
| Alkali tank |
Sterilization tank | |
Inner wall: 3mm SUS 304; outer wall: brushed |
Pipe line for brewhouse | SUS304 |
Measuring cylinder | SUS304 |
Butterfly valve | Ø32 |
Butterfly valve | Ø38 |
Sight glass | Ø32 |
Saccharimeter | 0-10; 10-20 |
Spent grains harrow | SUS 304 |
Fermenter’s safety valve | ø32 |
Fermenter’s Sample valve | ø32 |
Pressure gauge | 0-0.6Mpa |
Pipe line for cooling unit | SUS 304 |
Cooling water solenoid valve | ø32 |
Cooling pipe insulation |
|
Expansion valve for cooling compressor |
|
Control box cable |
|
Signal wire |
|
SIEMENS frequency convertor | V20 |
Electric relay | Omron |
Temperature sensor | PT100 |
FCL: Standard Export Package suitable for long marine transport
LCL: Ply wood case Package for long marine transport
Shipping Time:
Full sets of system needs around 35 days once order confrim
Fermenter tanks needs around 15-20 days according to order quantity
Considerate servise | We can provide services such as product design ( we recommend suitable equipment as per your budget), beer tank layout, installation and training of beer fermentation... |
Other Equipment | We also provide bottle filling and washing machine, keg filling and washing machine, label machine, keg and steam boiler as per your requirement |
Guarantee | 36 months for the main tank |
Reference Photos