plastic machine for hd pe pipe 63*2
Negotiable /Set
Min.Order:1 Set
Shanghai Jurry Plastic Machinery Co., Ltd.
plastic machine for hd pe pipe:
1 Extruder:
Parts | No | Name | Brand |
Electric parts | 1 | Inverter | Switzerland ABB |
2 | Contactor | Schneider | |
3 | Relay | Schneider | |
4 | Controlling system | Siemens Computer and PLC | |
5 | Breaker | Delixi | |
| |||
Driving parts | 1 | Motor | Siemens AC motor |
2 | Gear box | Top brand in China | |
| |||
Screw and barrel | 1 | Technology | Adopt German technology |
| 2 | Main materials | 38CrMoALA |
| 5 | Heating ring | Cast aluminum heating ring |
| |||
Feeder | 1 | Type: vacuum auto-loader with drying device | |
2 | Brand: Robot | ||
3 | For big PE pipe, we would add a gravity measurement device | ||
| |||
Protection system | 1 | Torque overload protection . | |
2 | Current overload protection. | ||
3 | A full set alarming system |
2 Mold
No | Name | Specs |
1 | Main materials | Mould steel |
2 | Temperature control system | Japanese RKC temperature meter |
3 | We have very advanced processing machines and skilled workers to insure the precision of the mold | |
4 | Heating ring | Mica heater |
4 Vacuum calibration tank
No | Name | Specs |
1 | Main material | Stainless steel |
2 | Water and vacuum pump from shanghai YvLong | |
3 | Main electric parts | Schneider |
4 | The tank is equipped with water level and water temperature and vacuum degree controlling system to insure good calibration effect. |
5 Spraying cooling tank
No | Name | Specs |
1 | Type | Window type, easy for operation |
2 | Water pump | Shanghai YVLONG |
3 | Main electric parts | Schneider |
4 | The tank is equipped with water level and water pressure controlling device. |
6 Hauler
No | Name | Specs |
1 | Hauling motor | TECO servo motor |
2 | Gear box | Densen (Germany joint venture) |
3 | Main electrics | Schneider brand |
4 | Hauling type | Caterpillar type |
7 Cutter
No | Name | Specs |
1 | Cutting type | No-dust cutter |
2 | Controlling system | Schneider PLC and Kinco panel |
3 | Main electric | Schneider |
4 | Cutting motor | Siemens AC motor |
8 Stacker:
No | Name | Sped |
1 | Type | Auto stacking |
2 | Main materials | Stainless steel |
9 After sales service:
----After production, we would invite you to test machines in our factory.
And we would like to give a brief training to your engineer in our factory.
----After shipment, we would send our engineer to install the machines and communicate with your engineer in your factory.
----After installation, we would reply to your problem within 24 hours and if necessary we could send our engineer to your factory.
Jurry factory:
Parts processing workshop: