PVC mixing mill with automatic nap adjustment
USD $45,000 - $100,000 /Set
Min.Order:1 Set
Zhangjiagang Lanhang Machinery Co., Ltd.
Founded in 1992, Zhangjiagang Lanhang Machinery Co., Ltd. is a private enterprise integrating scientific research, production, marketing and service of plastic machinery into one complete whole. After 10 years of hard work and continued efforts to improve product quality, we passed ISO9001 certification for our products.
Our "Lanhang" brand of planetary roll extruders, straining extruders, powerful horsepower dense mixers, mixing rolls, and high-speed mixers are the backbone of our company.
1) Application
Used for plastic plasticizing, calendering and pressing.
2)Main techinical parameter
ProjectModel | SK400*1000 | SK450*1200 | SK560*1830 | SK610*2030 | SK660*2300 | SK760*2800 |
Front/back roll diameter(mm) | 400 | 450 | 560 | 610 | 660 | 760 |
Working length(mm) | 1000 | 1200 | 1830 | 2030 | 2300 | 2800 |
Main motor power(kw) | 45 | 55 | 75 | 90 | 132 | 220 |
Reucer speed box | Hard toothed | |||||
Type of drive | Cardan shaft |
3) machine list
No. | Item | Quantity |
1 | Roller | 2 pc |
2 | Temperature controlling device | 2 set |
3 | Machine bed | 1 set |
4 | Nip adjusting device | 1 set |
5 | Blocking device | 1 set |
6 | Cutting device | 1 set |
7 | Stock pan | 1 set |
8 | Speed reducer | 1 set |
9 | Reducer lubricating system | 2 set |
10 | Emergency brake, safety device | 2 set |
11 | Control system | 1 set |
12 | Main motor | 2 set |
1. Payment: 30% by T/T as down payment money, balance (70%) by T/T before shipment.
2. Lead Time: 90 working days after receiving the down payment money.
3. Package: PE film, pallet at the bottom (if necessary).
1. Warranty period: From the day of the use of the machine in the buyer’s factory:
(1) The mechanical Parts: 12 months
(2)The electrical Parts: 6 months
2. Installations and Commissioning
(1)Up to date commissioning has been made before shipment
(2)Overseas Commissioning and charges:
0ne or two technicians will be sent to the buyer to guide the installation and commissioning of thequipment if the customer requests.
Customers pay the charge of our technicians.
1) Round-trip Airplane Tickets
2) Charges of transportation, accommodation and communication
3) The allowance of the technicians is USD 100 per day for one person.
4) An interpreter is needed.
3 English manual, Figuration drawing, and footing drawings are provided.
Pictures for your references:
1) Our products:
2) Our ceitifications and workshop: