downhole well centralizer for oilfield drilling
USD $10 - $111 /Piece
Min.Order:1 Piece
Dezhou Yuanda Petroleum Machinery Co., Ltd.
downhole well centralizer for oilfield drilling
the downhole well centralizer material is spring steel plate, after the laser cutting will roll forming, after heat treatment, the centralizer will achieve the API elastic and start restoring force.
Features:
1.high strength centralizer suitable for deep wells, exploratory well , high deviated wells.
2.advanced technology , strong central performance.
3.safety with low drilling force and the maximum restoring force.
4.high quality ,convenient to use and easy transportation.
vide a reliable and safe well service by our professional engineer team on cementing oilwell
2. manufacture as customers design details request
3. the centralizer colors according to acustomers'
4. good and safe package for sea transportation
5.high quality and consistent reliable integral centralizer
1.Dezhou Yuanda Petroleum Machinery Co., Ltd. is a very famous high tech enterprise and one of leading factory
in Dezhou China.
2.We have our own design,development,production,sales and sevice
3.Registered capital of 20 million yuan, covers an area of 78,000 square meters,two large production plants which cover 9,000 square meters , 4. Advanced production equipment with a total investment of more than 30 million in fixed assets element.
5.Employs 128 people, including 38 engineers and technicians, and 86 secondary education workers.
6.We has passed ISO9001 quality system certification of DNV, ISO14001, OHSAS18001 certification.
1.Question:How to store?
Answer :The product should be stored in a dry warehouse with a flat ground, the accessories should be
kept away from rain, sunshine and exposure of sea water. Make sure not to unpack or remove
the plastic bags unless you need it to work.
2.Question:How to transport?
Answer :Handle with care, no deformation should occur due to dropping or collision during convey.
3.Question: What's the demand for maintenance?
Answer :Storage time should not exceed 2 years.