Heavy Welded Wire Mesh Machine/Automatic Bird Cage Mesh Welding Machine
USD $12,295 - $26,229 /Piece
Min.Order:1 Piece
Huanghua Feiteng Wire Mesh Machine Co., Ltd.
Heavy Welded Wire Mesh Machine
Automatic Bird Cage Mesh Welding Machine
Function features of the welded wire mesh machine:
mainly used for constuction mesh.
The main parameter:
Other auxiliary equioment:
Welcome to visit our Feiteng office and factory.
Feiteng is located in Huanghua County ,Shijiazhuang,Hebei Province. Adjacent to the capital of China--Beijing, and not far from the Tianjin International Newport.
Feiteng is a private enterprises with highly educated and professional technical team,it owns more than 200 people,containing designers,engineers,senior technical backbone nearly 30 people. We have been manufacturing for 16 years, our company produces all sorts of wire mesh machines and sell well domestic and foreign, such as reinforcing mesh welding machine ,grassland fence weaving machine ,welded wire mesh machine etc.
Pre-sale service:
1. “service first, credit first”
2. Take the initiative to provide customers with the knowledge of the equipment ,guide customers to buy the equipment which is suited to their needs!
3. Let customer master its methods of usage and maintenance.
Sale of services:
1.Respect for customer and provide active service.
2.Professional technical team to provide technical advice, confirm customers needs and offer complete solutions.
After sale services:
1.Perfect services system and professional service team provides installation, commissioning ,training and other services overseas;
2.Answer product consultation;
3.Quality warranty for one year except the wearing parts.
FAQ--About the inquiry
Before preparing the inquiry, pls inform the below basic specification. so that we show the quotation .
1. wire diameter
2. mesh size
3.welding width etc.
Easily Operating & High Quality & Moderate Cost welding machine for you!
FAQ--About Delivery Term
Q--What's the delivery term for making business with us?
A--Usually we send the shipments in FOB term .However,the terms of CIF and C&F are acceptable which depend on preference of clients.
FAQ--About Lead Time
Q--What's the lead time after placing the order?
A--Usually it takes about 20-40 days after we received your confirmation.However,it would depend on our production line schedule(the timing clients place order)and the complication of the item.
FAQ--About Payment Term
Q--What's the payment term?
A--By T/T in Advance, or Irrevocable L/C as Sight
We will reply your email or fax within 24 hours.
You can call us at any time if there is any question on our production.