Product Details

China JULI brand 6T-15C Hydraulic crawler pile driver with 24m pile leads

Condition New
Efficiency 98%
Piling Speed(m/min) 7.1m/min
Place of Origin Jiangsu, China
Brand Name JULI
Model Number 6T-15C
Weight 24t
Dimension(L*W*H) 14*5.6*25m
Certification ISO9001
After-sales Service Provided Engineers available to service machinery overseas

Product Features

Product Description

JULI brand 6T-15C hydraulic crawler pile driver 

Features

 

Crawler pile driver, which is based on the track installation slewing bearing, installed on the rotary bearing pile frame, transformer oil cylinder, equipped with complete 0-90 degree Angle change. Form a complete set of hydraulic winch, can complete the ascension of pile hammer, and the lifting of the pile, caterpillar chassis engine with high pressure oil drive crawler machine driving and hydraulic power source, you need a pile driver on integral crawler crane installation with four retractable supporting legs stretched out, ensure the stability of the crane in the pile driving effect. Multiple operating valve to complete all the action of the hydraulic system.

 

Diesel pile hammer

1. Working based on two stroke internal combustion diesel engine principle

2. Soft soil starting, cold starting very well

3. Simple structure, convenient for maintain

4. Combine with our company diesel pile hammer, and reach a good performance

5. Widely used for metal pile, concrete pile, infuse pile and tamp pile

6. Application: port, wharf, airport, superhighway, railroad, high foundation building, etc.

 

Parameter

 

 

Type6T-15C
The host hoistsPulling force of single rope5000kg
Pulling speed20m/min
Vice hoistsPulling force of single rope5000kg
Pulling speed15m/min
Biggest suitable hammer model DD63
The largest length of pile15m
Permission slope≤2°
Displacement methodcrawler
Track plate length800mm
Center distance of track4400mm
Revolving360°
Outlook   sizeWorking14*5.6*25m
Transportation15.5*2.4*3m

 

China JULI brand 6T-15C Hydraulic crawler pile driver with 24m pile leads

 

China JULI brand 6T-15C Hydraulic crawler pile driver with 24m pile leads

 

China JULI brand 6T-15C Hydraulic crawler pile driver with 24m pile leads

Packaging & Shipping

 China JULI brand 6T-15C Hydraulic crawler pile driver with 24m pile leads

Company Information

Dongtai JuLi Machinery Manufacturing Limited Company, located in the beautiful coast of the yellow sea, Dongtai,No.9,BeiGuan road ,Economic development zone, Jiangsu province.Our factory covers an area of 80 acres, plant area of 30000 square meters, with vehicles, drilling, planing, milling, grinding and other kinds of various machine more than one hundred sets, equipped with 32 tons and16 tons gantry crane, and dozens of forklifts .
The company has many years of experience in machinery manufacturing and sophisticated equipment, is specialized in designing and manufacturing large engineering machinery, horizontal directional driller and supporting tools.because of our reliable quality, perfect service, products are sold well in China and exported to over ten abroad countries , deeply welcomed by the clients.
Production products: DD series guide rod type diesel pile hammer 2.5 tons, 3.2 tons, 4.0 tons, 4.0 tons, 6.3 tons, 7.3 tons, 7.3 tons, 9.3 tons, 10.3 tons, 10.3 tons, 12.8 tons, 16 tons, 20 tons, pile machine series 40, 60, 80 tube walking type and 360 degrees rotary pile machine, 120 tons to 1000 tons static pile driver.Trenchless guide drill JL - 15, JL - 20, JL - 28, JL - 32, JL - 40, JL - 68 and JL - 245 type, and supporting all kinds of drill pipe, drilling tools, spare parts supply, international brand guide apparatus, etc.
Main use: guide rod type diesel pile hammer piling machine, CFG pile machine used for Bridges, high-rise building, highway, railway, water conservancy, power station, wharf and other projects in wood piles, metal piles, precast concrete piles, hammer compaction piles, etc.
Characteristic: the guide rod type diesel pile hammer compare with the other pile hammers, it has simple structure, convenient operation and maintenance, and cold start performance is good,etc.
Horizontal directional driller can be used to lay pipelines for crossing river, roads, railways, building barriers. including all kinds of power cable, communication cable, heat pipes, gas pipes, urban water supply and drainage pipeline, etc.

China JULI brand 6T-15C Hydraulic crawler pile driver with 24m pile leads

 

FAQ

 1) How can I place order? 

A: You can contact us by email about your order details, or place order on line.

2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using.

3) What’s the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don’t have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.  1) How can I place order?
A: You can contact us by email about your order details, or place order on line.

2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using.

3) What’s the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don’t have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now