What is Horizontal Directional Drilling?
The use of HDD was developed to install utility pipes and cables beneath or around a variety of surface obstacles including roads, rivers and railways. The technology was conceived in the 1970's combining techniques used by road boring and oil and gas directional drilling. HDD's are relatively compact and have a small footprint that allows the equipment to be set up in relatively tight spaces such as the boulevard of a roadway.
JL-60/85 Horizontal Directional Driller is a new underground piping construction machinery which is based on the advanced theory of “Trenchless Technology”. With fully hydraulic and power-drive technology, it achieves drilling, rotating, back-broaching, back-towing, and travelling. It is widely used for pipeline construction and maintenance for water supply, coal gas, electric power, telecommunication, natural gas, and petroleum in railways, roads, buildings, rivers, and other construction-limited areas, such as cultural protection areas, downtown areas, crops and vegetation conservation areas.
Engine system Cummins engine: It can meet complicated jobsites construction demand. The engine also has high reliability and low energy consumption. | |
Mud pump Adopt ‘Tongfang’ mud pump which has 4 flow rates and 4 level pressures. So it can meet different diameter holes drill and pullback. The hydraulic motor drives the system, offering high pressure and stable performance. | |
Travel system Use the same system as excavator system’s support wheel, guide wheel, track idler, driving ring and spring. Rubber crawler or steel crawler with rubber palte has no damage to the road. Huge torque motor ensures strong grade ability. | |
Push and pull device Adopt motor and chain structure, rack and pinion structure, offering stable move, huge push force, convenient maintenance and reliability. | |
Clamping device The open-loop clamping structure is adopted, making the operation intuitive, convenient and reliable. | |
Power head Adopt ‘Tilorms’ large torque cycloid motors, power takeoff is much stronger. The two-speed rotation is controlled in the electro-hydraulic way and it is easy to operate. |
- Engineers available to service machinery overseas
- Offices in India, Indonesia
- Spare part will be sent immediately
- 24 hours online technical support
- Total logistics information tracking report
Dongtai JuLi Machinery Manufacturing Limited Company, located in the beautiful coast of the yellow sea, Dongtai,No.9,BeiGuan road ,Economic development zone, Jiangsu province.Our factory covers an area of 80 acres, plant area of 30000 square meters, with vehicles, drilling, planing, milling, grinding and other kinds of various machine more than one hundred sets, equipped with 32 tons and16 tons gantry crane, and dozens of forklifts .
The company has many years of experience in machinery manufacturing and sophisticated equipment, is specialized in designing and manufacturing large engineering machinery, horizontal directional driller and supporting tools.because of our reliable quality, perfect service, products are sold well in China and exported to over ten abroad countries , deeply welcomed by the clients.
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using.
3) What’s the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don’t have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure. 1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
6) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using.
7) What’s the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don’t have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
8)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
9)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.