Product Details

25 ton high speed underground cable laying machine / JL-25 horizontal directional drilling machine

Condition New
Type Other, horizontal directional drilling rig, Underground Pipe laying Machine
Power Type Diesel
Place of Origin Jiangsu, China
Brand Name JULI
Model Number JL-25
Usage Other, cable
Voltage 24V
Power(W) 125kw
Dimension(L*W*H) 6100*2100*2100
Weight 8000kg
Certification ISO9001
Warranty One Year
After-sales Service Provided Engineers available to service machinery overseas

Product Features

Product Description

 JL250 Horizontal Directional Driller is a new underground piping construction machinery which is based on the advanced theory of “Trenchless Technology”. With fully hydraulic and power-drive technology, it achieves drilling, rotating, back-broaching, back-towing, and travelling. It is widely used for pipeline construction and maintenance for water supply, coal gas, electric power, telecommunication, natural gas, and petroleum in railways, roads, buildings, rivers, and other construction-limited areas, such as cultural protection areas, downtown areas, crops and vegetation conservation areas.

JL-25 ton horizontal directional drilling machine
Specifications
Engine BrandCummins6BTA5.9-C125 (125kW)
Weight of machine8500kg
Overall Dimension (L×W×H)6100x2100x2100
System voltage24V
Operational
Pullback(max)250kN
Thrust(max)250kN
Spindle torque(max)8000Nm
Spindle speed0-125r.p.m
Incidence angle8-20°
Ground drive speed 0-1.5km/h
Grade ability25°
Drilling parts
Diameter of bit73mm
Length of drill pipe3000mm
Specification of backreamerØ200, Ø300
On-board fluid system
Max pressure8Mpa
Max flow rate250L/min

 

 25 ton high speed underground cable laying machine / JL-25 horizontal directional drilling machine

 

25 ton high speed underground cable laying machine / JL-25 horizontal directional drilling machine

 

25 ton high speed underground cable laying machine / JL-25 horizontal directional drilling machine
Our Services

 

  • Engineers available to service machinery overseas
  • Offices in India, Indonesia
  • Spare part will be sent immediately
  • 24 hours online technical support
  • Total logistics information tracking report
Company Information

 

Dongtai JuLi Machinery Manufacturing Limited Company, located in the beautiful coast of the yellow sea, Dongtai,No.9,BeiGuan road ,Economic development zone, Jiangsu province.Our factory covers an area of 80 acres, plant area of 30000 square meters, with vehicles, drilling, planing, milling, grinding and other kinds of various machine more than one hundred sets, equipped with 32 tons and16 tons gantry crane, and dozens of forklifts .
The company has many years of experience in machinery manufacturing and sophisticated equipment, is specialized in designing and manufacturing large engineering machinery, horizontal directional driller and supporting tools.because of our reliable quality, perfect service, products are sold well in China and exported to over ten abroad countries , deeply welcomed by the clients.

25 ton high speed underground cable laying machine / JL-25 horizontal directional drilling machine

25 ton high speed underground cable laying machine / JL-25 horizontal directional drilling machine
FAQ

 

1) How can I place order?
A: You can contact us by email about your order details, or place order on line.

2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using.

3) What’s the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don’t have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.  1) How can I place order?
A: You can contact us by email about your order details, or place order on line.

2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using.

3) What’s the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don’t have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now