2014 new 2600mAh power bank !!! super fast mobile phone charger
USD $1.5 - $3.5 /Piece
Min.Order:1 Piece
Ningbo Keqiang Battery Co., Ltd.
2014 new 2600mAh power bank !!! super fast mobile phone charger
Our advantages:
1) We are factory: Good price & fast delivery.
2) We only do private tooling, A-grade polymer batteries, high quality materials & exquisite details.
3) Reliable quality with patent, CE, RoHS, FCC, C-Tick certificates.
4) OEM/ODM, customers design is welcome.
5) Excellent service, fast reply.
6) Sample order or trail order for test is acceptable.
Capacity | 2600mAh |
Input | 5V/0.8A |
Output | 5V/0.8A |
Cell | Li-ion Battery |
Size | 107.5*21.5*21.5mm |
N.W | 80g |
Lifetime | ≥500 times |
Feature | High Power Led Flashlight |
Color | Blue/Pink |
KETRON was founded in 1995 and has been dedicating in assemled battery. Twenty-year technological accumulation makes us have the ability of good industrial resource integration and builds top-ranking product quality of KETRON. It is used as purpose of enterprice to provide clients fast and responsible service, ensure every client’s confidence on mobile power of KETRON with powerful service management and establish KETRON into high-quality brank of global battery industry carefully.
KETRON ensures each of products in the market only after strict multiple tests and tries its best to reduce maintenance opportunity based on quality philosophy of “quality service is the largest one”.
We selcect the high-quality components supplier,inspect each of stored equipments strictly and assure quality of KETRON at the sourse.
Each of our products stands up standard performance examination and operation of every technical process is in conformity with standard system of ISO9001.
INSPECTION PROTOCOL AND QA FOR LITHIUM BATTERY
No. | unit | min | type | max | remark | |
charge | ℃ | 0 | 25 | 45 | ||
discharge | ℃ | -20 | 25 | 65 | ||
storage | ℃ | -20 | 25 | 45 | 1 month | |
℃ | -20 | 25 | 35 | 6 months |
Before storage, batteries should be charged to 40%-65% of full capacity
Characteristics testing:
item | test method | Requirements |
Charging/Cut-off Voltage | 4.20±0.01V | |
Discharge/Cut-off Voltage | 3.00±0.01V | |
Standard Charge | Charge the battery at constant current of 0.2C to reach 4.2V. Then charge the battery at constant 4.2V voltage until , the charging current decreasing to 0.01C. | Charging time≤8h |
Standard Discharge | After the standard charging,rest for 1 hour then discharge, to 3.0V 0.2c | |
Rate Discharge | After the standard charging,rest for 1 hour then discharge, to 3.0V 0.5C | Discharging time≥102Min |
High Temperature Characteristics | Fully charging, store them at (55±2)℃ for 2 hours, then discharge to 3.0V @0.5C | Discharging time ≥102 Min , No transform, no explosion,no fire,no leakage |
Low Temperature Characteristics | Full charging, store them at (-10±2)℃ for 16-24 hours, then discharge to 3.0V @0.2C | Discharging time ≥255 Min, No transform, no explosion,no fire,no leakage |
Capacity retention | Fully charging, store them at (20±2)℃ for 28 days, then discharge to 3.0V 0.2C | Discharging time ≥255 Min, No transform, no explosion,no fire,no leakage |
Cycle Life 25℃ | Charge the battery @0.5C to reach 4.2V. Then charge the, battery at constant 4.2V voltage until the charging current, decreasing to 0.01C. Rest for 10 min. discharge to 3.0V 0.5C and rest for 10 min. Continue the charge/discharge cycles until discharge capacity lower than 80% of rated capacity | Cycle life ≥500 |
Storage | Charge the battery to 40%~65% of its rated capacity using, standard charging mode, then keep it in an 20℃±5℃, humidity 45%~85% room for 12 months. Discharge it 0.2C until voltage down to 3.0V | Discharge time ≥240Min |
Environment Characteristics:
Item | Testing Method | Requirements |
Hot & humidity testing | Full charging, store it at 40±2℃ with 90%~95RH% for 48 hours. Then put the battery at room temperature 20±2℃ for 2 hours. Then discharge to 3.0V 0.5C | Discharging time ≥72 Min no transform, No erosion, no explosion,no fire,no leakage |
Vibration | After Standard Charging,fixed the battery to vibration table,then subjected to vibration test for 30 minutes per axis of XYZ axes | No explosion,no fire, no leakage. Voltage≥3.7V. |
Shock test | After Standard Charging,test condition Acceleration :100m/s2 Crash time per min: 40-80 times, Pulse lasting time : 16ms , Shock times : 1000±10times | No explosion, no fire, no leakage. Voltage≥3.7V. |
Drop Test | After standard charging , drop the battery from 100cm, height onto a 18mm~20mm thick hardwood. Two sides of X,Y,Z directions each (total 6 times) After the drop test, discharge the battery 0.5C to 3.0V Then charge it 0.5C to full capacity. Continue the test within 3 times the battery should reach the target once | Discharging time ≥102 Min No erosion, no explosion,no fire,no leakage |
Safety Performance
Overcharge protection test | After standard charging. Apply a 7.4V stable Voltage and 1C stable current to the battery for 8 hours | No fire, no explosion |
Over discharge protection test | After discharged to the cut-off voltage,the battery shall be subjected to a short-circuit condition with a load of resistance less than 30Ω for 24 hours | No fire, no explosion |
Short circuiting protection test | After standard charging,the battery shall be subjected to a short-circuit condition with a wire of resistance less than 100mΩ for 1 hour. Cut off the circuit, Charge the battery with constant current at 1.0C for 5s | No fire, no explosion, Voltage≥3.7V |
Impact Test | After standard charge,Place the battery on a flat surface. A 9.1 kg article is to be dropped from a height of 100cm onto the sample. The battery is allowed to transform | No fire, no explosion |
Heating Test | After standard charging,a battery is to be heated in an oven convection or circulating air oven. The temperature of the oven is to be raised at a rate of 5±2℃/min to a temperature of 130±2℃ and last for 30 minutes. | No fire, no explosion |
Over charge | After standard charging, put the battery in fume hood. Add constant voltage & current 4.8V 3C to the battery. Charging it until the battery reaches 4.8V, charging current decreases to almost 0A. Record the temperature curve of the battery. When the battery temperature decreases to about 10℃ lower after reaching the peak temperature. End the test. This test is performed without PCM | No fire, no explosion |
Short circuiting test | After standard charging, put the battery in fume hood. Connect the Negative Pole and Positive pole directly. (the wire’s resistance should below 50mΩ. Record the battery’s temperature curve during the test. When the battery temperature decreases to about 10℃ lower after reaching the peak temperature. End the test. This test is performed without PCM | No fire, no explosion |
Caution :
1. When charging ,please use original charger, otherwise, battery charger may be damaged.
2. When charge other digital product, please use original transfer cable.
3. Choose proper transfer connector and transfer cable to match your digital device. Please complete to charge and discharger for once at first time use battery charger in order to active battery cell.
4. Don’t collision, strike, disassemble or try to repair it by yourself .Keep battery charger dry and avoid immerge water.
5. Keep away from fire. Don’t use around flammable gas.
Safety:
1.Li-ion polymer cell abandon the possibility of exploding
2.Short-circuit protection
3.Over-current protection
4.Over-charging protection
5.Over-discharging protection
After-sale Service:
1. 12 months/one year warranty policy.
2. We will replace the broken parts with new parts in the next order.
3. Choose the safest shipping company.
4.rack the order until you get the Portable Power Bank.
Terms & Condition
1.)Buyers’ logo can be printed on the power bank or the package.
2.)Package:PET package or color box package according to customer requirement.
3.)MOQ:1pcs
4.)Samples time : 2 ~ 3 days
5.) Lead time : within 2 weeks after receiving 30% deposit
6.)Payment terms : 30% deposit and 70% balance by T/T before shipment.
Any questions ,fell free to call :+86 13165939787 contact person :kobe chen skype:powerbank1990 wechat:13165939787