most popular hot sales fashion newest plastic cup mold manufacturer
Negotiable /Set
Min.Order:1 Set
Shanghai Yuanhai Plastic Mould Co., Ltd.
1.Mould Material :Mold Steel S136
-Sample Material: ABS
-Cavity: 1*1
2.Mould Standard:LKM/HASCO/DME
3.Mould Base:LKM/DME/HASCI etc
4.Runner type :hot /cold
5.Design software:UG.Mastercam,CAD,etc.
6 .plastic material :PP/PE/PA/PC/ABS/PU/PVC/PS /PC+ABSetc
7.Mould LIfe :at least 200,000shots
8.Packing :Depends on customer's requirement
9.Transport :by sea or by air
10.Delivery time :30---45days
11.Specifications:Depends on customer's requirement .
Name | Plastic Injection Mold |
Mold Base | LKM,DME etc |
Core Material | 45#, 50#, P20, H13, 718, 2738, NAK80, S136, SKD61, etc. |
Standards | DME, HASCO, |
Cavity | Single/multi |
Runner | Hot/Cold |
Design Software | UG, PROE, CAD, Solidwork etc |
Plastic Material | PP, PC, PS, PET, ABS, SAN,PMMA etc |
Mold Lifespan | 300,000-1,000,000 shots |
Original | Shanghai, China |
Delivery Time | 35 - 45 days |
Specification | Depends on customer's requirements |
Advantage:
1.Competitive price.
2.Continuance service and support.
3.Diversified rich experienced skilled workers.
4.Custom R&D program coordination.
5.Application expertise.
6.Quality,reliability and long product life.
7.Mature,perfect and excellence,but simple design.
8.Good after-service
9.Punctual delivery time
Engineering capabilities include:
1.Parts design.
2.R&D products.
3.Prototype design and production assembly.
4.Reputable design software used for all design work.
5.Hot runner design.
6.Cold runner design.
7.Fast automatice remould design.
8.Mold design with a team of experienced specialists.
Description of Service
In-time reply the telephone calls ,Fax or E-mail
In-time provide the quotation and mould design
In-time communication on technical points
In-time attaching the picture for the mould machining progress and mould finishing plan
In-time mould test and sample delivery
In-time mould delivery
Process:
1. Quote competitive price according to customer’s detailed requirement.
2. Sign agreement.
3. Customer T/T deposit to us to start to design mould.
4. Send mould drawing to customer for confirmation.
5. Mould design confirmed and start to make mould.
6. Make mould trial during tooling time ( Which we get agreement with customer).
7. Send mould trial sample to customer for inspection .Or customer come to our factory to inspect mould personally.
8. Customer T/T balance to us after mould confirmed.
9. Deliver mould after get balance
ISO9001:2008
Factory image
Customer visit image