2014 Cinder Double Roller Crusher
USD $999 - $11,000 /Set
Min.Order:1 Set
Shandong Chengming Construction Machinery Co., Ltd.
2014 Cinder Double Roller Crusher
Principle of operation:
This equipment adopts two motors, which take two rollers to rotate reversely by the decelerator. when the materials drop on the rollers through the charge hole,Under the friction of the rollers, they are dragged between the two rollers, grinded by the roller's crushing, the grinded materials are pushed rotatorily by the rollers.
Performance features:
1. The structure is simple and compact, the noise is low, the efficiency is high.
2. The installation is flexible, basically needs no foundation.
3. The rollers' surface adopts anti-abrasive welding rod or exchangeable dental plate, the maintenance is simple.
4. Self-preservation ability is strong, the high-hardness materials (such as all sorts of metal block) won't break the equipment's parts when they enter the shredding breach.
5. The discharge gram size is adjustable, the minimum can reach 2-10 mm.
Applicability:
1. Widely applied to fine processing of building materials, metallurgy, chemical industry, coal etc crafts.
2. Especially applied to the finement of the clinker, adjusting the grinding mill grading can increase productivity 30-50%.
Specification:
Model | Diameter of Rroll (mm) | Feed Size (mm) | Grain Size of Discharge(mm) | Capacity (t/h) | Power of Motor (KW) |
PG2X-400 | 400 | ≤30 | ≤2-8 | 5--15 | 11 |
PG2X-600 | 600 | ≤50 | ≤2-10 | 12--40 | 15 |
PG2X-800 | 800 | ≤80 | ≤3-10 | 18--75 | 18.5 |
PG2X-1000 | 1000 | ≤100 | ≤3-10 | 32--110 | 22 |
PG2X-1200 | 1200 | ≤120 | ≤5-10 | 36--150 | 30 |
PG2X-1500 | 1500 | ≤140 | ≤5-10 | 48--180 | 37 |
About Warranty:
Our Warranty is 1 year for whole machine except wearing spare parts.We will provide the technical advice and find the solution immediately for you when the machine is in trouble-shoot. For wearing spare parts, we guarantee the high quality parts for long-time supply.
Our Services:
1. We guarantee our reply in 24 hours of working day.
2. Our engineers will communicate with our customers in different languages to help them to solve the technical questions and quality issues.
3. Our professional QA people make strict inspection before shipment.
4. Punctual shipment time and good after-sales service will be guaranteed.
Click Here To Visit Our Home Page, And You Will Find More Surprises~
http://sypsj.en.china.cn/
2014 Cinder Double Roller Crusher 2014 Cinder Double Roller Crusher 2014 Cinder Double Roller Crusher 2014 Cinder Double Roller Crusher 2014 Cinder Double Roller Crusher 2014 Cinder Double Roller Crusher 2014 Cinder Double Roller Crusher 2014 Cinder Double Roller Crusher 2014 Cinder Double Roller Crusher 2014 Cinder Double Roller Crusher