plastic top lip supplier
USD $0.25 - $0.5 /Piece
Min.Order:1000 Pieces
Dongguan Junyi Hardware & Plastic Co., Ltd.
Step:
1.Clients offer 3D drawings and sufficient information of the moulds and plastic products |
2.We offer the quote of plastic mould and injection moulding(plastic parts) within 24 hours |
3.Clients consider our quotes |
4.Client place the order |
5.We design and manufacture the plastic molds in leadtime after confirming the drawings and detailed information with clients again |
6.Plastic mould trial samples sent to clients to get their confirm and to see if there is any modification before mass production |
7.Arrange mass production at once and finish the production before the leadtime |
8.Delivery by sea and air on time |
If you want to moulded part, moulded product, mould manufacture who can help you to save cost and offer high quality products and prompt service, why do not you email her at once?
Equipment List
Type | Quantity | |
Tool Room | CNC | 3 |
EDM | 4 | |
Milling machine | 5 | |
Grinding machine | 3 | |
Drilling machine | 2 | |
Injection Department | Injection machine (60~660T each) | 20 |
Painting & printing Department | Painting line | 1 |
Printing line | 1 | |
Assembly line | 1 | |
Pad printing machine | 3 | |
Ultrasonic machine | 2 | |
Automatic painting line | 1 |
View of our factory:
Office
Engineering Department
Mould Making Department
Injection Workshop
Painting & Printing Department
You are welcome to visit our company!