Vacuum Dry and Oil Filling Equipment
USD $1,200,000 - $3,000,000 /Set
Min.Order:1 Set
Shanghai Trihope International Co., Ltd.
Vacuum Dry and Oil Filling Equipment
1.General Information
1)This equipment is specialized in vacuum dry - vacuum oil filling for 10KV—35KV lever oil immersed transformer .
2)There are many methods for dehydration for transformer body under vacuum environment. Each improvement of drying process is to maximize the efficiency of heating and vacuum. Vacuum and heating is the requirement for vacuum dry for transformer body.However, heating under normal air pressure will create ageing problem for body and rusting for iron core ; while Vacuum heating process is very slow as the heat convection and conduction depend on radiation. Pressure transformation vacuum dry is more effective and economic method which can solve above problems.
2. Equipment components
vacuum dry and oil filling tank system | 1 set |
Vacuum storage tanks | 1 set |
Vacuum system | 1 set |
Heat conduction oil heating system | 2 set |
Compressed air system | 1 set |
Refrigeration system | 1 set |
Measurement and control system | 1 set |
The spare parts | 1 set |
3. Technical parameters and each system configuration
Vacuum drying-Tank injection system | 1 set |
Vacuum storage tank 1 set | 1 set |
Vacuum systme | 1 set |
Heat conduction oil heating system | 2 sets |
Compressed air system | 1 set |
A set of refrigeration system | 1 set |
4. Main components supplier
Name | Quantity | Supplier |
Vacuum pump Vacuum pump | 11 | Zhejiang Vacuum Zhejiang Vacuum |
Vacuum main valve | Several | Chuzhou |
Transformer oil oil valve | Several | Shenzhen |
Vacuum sensor | 4 | Leybold |
The programmable controller | 1 | Panasonic |
Small ball float liquid level switch | 8 | Shanghai |
Flow meter | 8 | Chengde, |
Turn the magnetic level gauge | 1 | Shenyang Instrument institute |
Heat conduction oil oil valve | Several | Shenyang |
Temperature sensor | 4 | Germany original |
Refrigerator | 1 | Hongkong |
Air compressor | 1 | Buyer |
Solid state relay | Several | Wuxi |
The lighting window | 10 | Shenzhen |
Seal for door of tank | 1 | Shenzhen |
Main electrical components | Schneider |
5. Necessary conditions for installation and commissioning
Workshop crane | 1 set |
Riveter | 2 persons |
Welder | 2 persons |
Plumber | 1 person |
Armor | 2 persons |
Labour | 2 persons |
Electric welder | 2 sets |
Shanghai TRIHOPE International Co., Ltdwas registered in Shanghai China in the year of 2003. Its total investment is about USD 2 Million. Being a professional foreign trading company, TRIHOPE is also the marketing institute of its sister company M/s SENERGE Electric Equipment Co., Ltd,which is a professional equipment manufacturer.
SENERGE Electric Equipment Company (SENERGE) was established in 2009, located in Shanghai Zhang Jiang Pinghu Hi-Tech Zone. The total investment of SENERGE is more than 5 million USD. SENERGE has full range of good machines and tools to ensure its machining process and offer customer good quality products.
More than 35 years working experience of design and manufacturing in transformer industry. Served as tranformer and transformer equipment design and technology in Shanghai Transformer Factory, ALSTOM, AREVA, and other domestic transformer factories.
With 35 years working experience in transformer industry. Served as transformer manufacturing in Shanghai Transformer Factory, ALSTOM, AREVA, and other domestic transformer factories.
Master degree of enigneering. 25 years working experience. Once worked in Pakistan, Indonesia overseas factories; visited nearly 40 countries, traveling throughout Africa, South America, America, Oceania, Asia and other places, with a wealth of experience working overseas.