5 Ton Gasoline Powered Winch For Hoisting Equipment With ISO 9001:2008 Certificate
Negotiable /Set
Min.Order:1 Set
Shuangli Locomotive Equipment (Shenzhen) Co., Ltd.
Product Description
Winch is short for mobile ground grinding, also called mobile ground grinding machine or mobile ground grinding, such as found in mobile ground mill is widely used areas, mobile ground grinding is an essential set up empty underground cable wiring, tight lines, stud, construction products, can smoothly under complex environment and convenient erection wire hoisting line, traction or tight.
Model NO. | Gear | Traction (KN) | Traction Speed (m/min) | HP (KW) | Dimensions (mm) | Weight (Kg) |
JM-1A-1 Gasoline Engine | Fast | 7.84 | 25 | 5.5 | 1100×480×600 | 130 |
Moderate | 14.7 | 13 | ||||
Moderate | 24.5 | 8 | ||||
Slow | 49 | 4 | ||||
JM-1D Diesel Engine | Fast | 9.8 | 24 | 6.7 | 1100×480×600 | 130 |
Moderate | 14.7 | 13 | ||||
Moderate | 24.5 | 8 | ||||
Slow | 49 | 4 |
Feature & Application
1.Widely used in construction of electric power, telecommunications, municipal engineering group legislature tight line tower or motor actinomycetes, suitable for field sites without electricity.
2.The field practice has proved that having a reasonable structure, small size, light weight, utilitarian, low noise, flexible operation and convenient transport advantages, the majority of users.
3. The machine consists of an engine, clutch, transmission, brakes, planetary gear, winch core composition, easy maintenance and repair, using a simple operation.
Products Pictures
Supporting the power of the engine is gasoline and diesel engines, to ensure traction situations, based on customer requirements, the choice of different types of gasoline and diesel engines. Diesel-hand or hand starting, the gasoline engine is hand-rope starter. Engine in China enjoy a reputation for reliable performance, easy operation and maintenance.
Erection and Installation
1. Motorized winch before installation should first carefully check for damage in transit phenomenon, if found should be repaired after use.
2. You must choose a good fixed pile or pile substitute, before installation.
3. After the motor cutter mill installation, the first to conduct a comprehensive inspection:
(1) the installation site pile or pile substitute, whether solid, safe and reliable;
(2) whether all parts of fasteners loosening, tighten if loose should be replaced;
(3)Wire rope connected with the pile are secure, and reliable;
(4) whether all the required lubricating adding oil;
(5) whether the clutch is disengaged, the engine rope is solid.
Production Base
Shuangli Locomotive Equipment (Shenzhen) Co., Ltd, located in Shenzhen, Guangdong, is specialized in the production of industrial and mineral electric vehicle, its ancillary equipment and accessories. Our main products are mineral over-head line electric vehicle, explosion-proof special battery electric vehicle and accessories.
We always adhere to technology innovation, establishing credibility, and people oriented policy, and pursue the quality first and customer first tenet. We have established a complete and stable quality assurance system, and gradually form modern management mode. We have passed through ISO9001-2008 quality management system certification, mean while nearly 50 models of products have "MA" and "KA" certification.
Product Certification
Contact
* Welcome to contact us with your detailed inquiry, you will be replied within 24 hours.
* You are promised to obtain the best quality, price and service.
* We'd like to provide samples for your confirm.
Looking forward to having cooperation with you!
Contact people: Mars zhang
Skype:live:mars9412
Cellphone:(+86)13632520024
Address: Room 401-15, Block A, Jiansheng Building, No.1, Pingji Road, Longgang District ,Shenzhen
Email:mars9412(at)