New designed toffee candy machine making plant
USD $50,000 - $80,000 /Set
Min.Order:1 Set
Shanghai Candy Machine Co., Ltd.
New designed toffee candy machine making plant
1. Application:
SGDT Series deposited toffee candy and electric all in one, using the silicon molds automatically depositing and with tracking transmission de-mouding system. It can make pure toffee, double color toffee, center filling toffee and stripe toffee. This line consists of jacket dissolving cooker, transfer pump, pre- heating tank, special toffee cooker, depositor, cooling tunnel, etc.
Toffee depositing machine flow chart:
Raw material dissolving→Transporting→Pre-heating→Toffee cooking→Add oil and fat→Storage→Depositing→Cooling→De-moulding→Conveying→Packing→Final product
1. Parameters:
Model | SGDT150 | SGDT300 | SGDT450 | SGDT600 |
Capacity | 150kg/hr | 300kg/hr | 450kg/hr | 600kg/hr |
Candy Weight | As per candy size | |||
Depositing Speed | 45 ~55n/min | 45 ~55n/min | 45 ~55n/min | 45 ~55n/min |
Working Condition | Temperature:20~25℃;Humidity:55% | |||
Total power | 18Kw/380V | 27Kw/380V | 34Kw/380V | 38Kw/380V |
Total Length | 20m | 20m | 20m | 20m |
Gross Weight | 3500kg | 4500kg | 5500kg | 6500kg |
2. Photos of this line:
New designed toffee candy machine making plant
1. Package: exporting wooden box
2. Delivery time: 60-90 days after order
3. Shipment: by sea or air
Installation service:
We will send one or two technical staffs to process the supervising of installation and debugging, training the operator for a period of about 15 days.
Purchaser has to bear the cost of return tickets by air, accommodation, besides, purchaser needs to pay a daily allowance per day per technical staff during the stay in purchaser area.
Warranty:
We will provide 12 months quality warranty from the delivery date.
Why choose us?
Advantages we have:
A. Experienced candy machine supplier;
B. Professional technical team and sales department for your service;
C. Alibaba golden supplier, factory recognized by CE;
D. All the questions will be dealed within 24 hours;
Benefits you get:
A. Stable quality——Coming from good materials and technic
B. Competitive price——Not cheapest but the most competitive at the same quality
C. Good service——Satisfactory service before and after sale
D. Delivery time——45~60 days for mass production
Contact us: