Waste Tire Recycling Plant 12TPD
USD $1,050,600 - $1,155,660 /Plant
Min.Order:1 Plant
Manufacturer & turnkey supplier of advanced Waste tire recycling plant. Unique advantages of Pyrocrat’s waste tire recycling plant are:
Pyrocrat has years of experience is supplying high performance waste tire recycling plant. Contact us to get product offer and related documents.
“Pyrocrat-3600TPA” (12TPD) Fully Automated Pyrolysis Plant
Sr. # | Equipment Name | Description |
I. | Air lock feeding system | - Piston feeding system with alternate Knife Edge Gate Valve Feeding System - With hydraulic power pack - Hydraulic pressure of 150kg/cm^2 - Loading hopper with photo cell and auto feeding system - Designed to feed both densified plastic and plastic film waste in shredded form |
II. | Pyrolysis Reactor System | - Patent Pending Design - Horizontal continuous type pyrolysis reactor - MOC:
- Jacketed for heating by hot air - Air lock valve for charcoal drain. - Reactor Jacket of SS304 - Support frame of MS - Attached in line geared motors - 3 Phase supply for overhead geared motor - Thermo well for temperature measurement /probe - Skid mounted |
III. | Heating System | - Duel: Hydrocarbon gas & Pyrolysis oil/LDO fired Hot Air Generator - With hi-low flame auto modulation - Power requirement 3 phase - Output air temperature of 750OC - With digital temperature indicator and feedback mechanism - Simplex heating and pumping unit - Skid mounted - HAG MOC:
|
IV. | Primary Condensation Assembly | - 2 units of Sludge separator - 1 Jacketed cooling vessel - 3 receivers with bottom flush valve, side outlet and cleaning hand hole of 6” - Shell and tube double pass condenser - MOC: MS & SS304 - Skid mounted |
V. | Hydrocarbon Gas Collection System | - Low pressure gas storage facility - Pressure Vessel: fabricated in MS plate with internal FRP lining with all accessories and pressure release valve for safety. - Liquid drains for gas storage and pressure vessel - Flameproof gas transfer blower - Piping of MS material along with two flame arrestors and safety valve for Storage - Pressure switch and Pressure Gauge: Two pressures Switch (one Standby) and one Pressure gauge will be supplied to control gas supply in the hot air generator. |
VI. | Recuperator | - Waste heat energy recovery from exhaust gases to heat the combustion air - Air to air heat exchanger - Shell and tube design |
VII. | Exhaust Pipe | - M.S. fabrication for exhaust of flew gases |
| Hot air recirculation Blower System | - Impeller MOC SS304 - Design temperature of 550OC - Belt driven |
IX. | Cooling tower | - FRP made - Natural Draft Cooling - Without basin |
X. | Scrubbing system | - Packed column type scrubbing system - With limestone scrubbing operation - Feed pump, circulation tank and spraying system - Designed to scrub NOx, Sox, Cox etc - MOC : MS |
XI. | Centrifugal Oil Filter System | - High speed centrifugal clarifier - With centrifuge, and oil transfer pump - Improves oil quality by separating the oil impurities in form of wax and carbon powder |
XII. | Fittings and fixtures | - Expansion bellows, Hot air ducting: SS304 - Recirculation air ducting: BQCS, Rest MS - Cutting machine of 14” size - Insulation - Pressure & temperature indicators, - Flanges, nut-bolts, gaskets, welding raw material etc required for installation of plant and machinery |
| Installation and Commissioning Guidance + Technology transfer | All guidance, supervision and technology transfer for: - All process plumbing, electrification, - Handing over the process for making process catalyst, - Technology transfer, - Taking out the trial batches - One week on-site training on manufacturing process |