inconel625 SB163 seamless cold finished nickel alloy steel pipe
USD $3.18 - $3.58 /Kilogram
Min.Order:500 Kilograms
Lord Steel (Suzhou) International Trade Co., Ltd.
inconel pipe/tube inconel 800 pipe seamless nickel alloy steel pipe price
inconel825 seamless good price cold finished steel pipe and tubes
steel pipe seamless tube inconel 625 cold rolled seamless steel tube
asme sb-167 inconel 1625 seamless cold rolled high alloy steel pipe price
asme sb-167 alloy 625 inconel 1625 seamless cold rolled high alloy steel pipe price
inconel pipe 800 seamless high quality inconel steel pipe price
Name | seamless & welded monel inconel alloy steel pipe & tube |
Standard | ASTM B163/ASME SB163,ASTM B165/ASME SB165,ASTM B167/ASME SB167,ASTM B704/ASTM B705,ASTM B470/ASME SB470,etc. |
Material | Monel400/H, Monel800/H, Inconel625, Alloy600, etc. |
OD | 6-530mm |
WT | 0.5-30mm |
Length | 0-38000mm |
Test | 1. 100% PMI / SPECTRO CHEMICAL ANALYSIS TESTS 100% PMI 2. 100% DIMENSION TESTS & 100% VISUAL EXAMINATION 3, EDDY CURRENT OR HYDRAULIC TEST OR UT NOTES : ALL THE TESTS AND INSPECTION NEED TO PROVIDE WITH REPORTS ACCORDING TO STANDARD AND TEST RESULTS. OPTION TEST & INSPECTION ITEMS: 1. ROUGHNESS TEST 2. CRYSTALLING PHASE ANALYSIS 3. INTERGRANULAR ATTACK TESTS 4. SHIPPING NOTIFICATION BEFORE SHIPMENT THE DOCUMENT LSI WILL PROVIDE YOU: a. MTC (MATERIAL TEST CERTIFICATION) ACCORDING TO EN10204/3.1 OR EN10204/3.2; b. RAW MATERIAL CERTIFICATION c. ALL THE TEST & INSPECTION REPORTS AS PER PO AND STANDARDS d. HEAT TREATMENT REPORT e. SHIPPING NOTIFICATION BEFORE SHIPMENT f. QUALITY WARRANTY LETTER. |
Package | In bundles, plywood cases, wooden cases with water-proof package, etc. |
Product origin | Jiangsu, China(main land). |
Trade terms | FOB, CIF, CFR, DDP, EXW, etc. |
Delivery | Container, LCL, consignment. |
1. Dose LORDSTEELTM have and operate a quality system? Which quality standard does LORDSTEELTM have? | |
Yes, both LORDSTEELTM office and facilities have got ISO9001:2008 Quality Management System, which audited by DNV and TUV. | |
2. What’s your capacity of seamless and welded pipe? | |
Seamless pipe & tube: 6000 tons/year; Welded pipe & tube: 5000 tons/year. | |
3. Does LORDSTEELTM establish Health, Safety and Environment System? Which institution certified it? | |
Yes, our facilities have already established HSE system according to ISO/CD 14690 and GB/T24001:2004 (IDT ISO14001) here audited by BDQC, member of IAF and CNAS. | |
4. Does LORDSTEELTM have his own test & inspection lab for tubes and pipes products? | |
Yes, we have two Test and Inspection Centres in our two facilities. More information, please contact our sales manager to require the details. | |
5. Is any discount for LORDSTEELTM’s Offer? | |
LORDSTEELTM Sales Team makes the offer according to ERP System with reasonable profits here. Special Discount Need to meet requirements and comply with internal audit system. | |
6. Does LORDSTEELTM accept more flexible payment terms? | |
Yes, LORDSTEELTM ‘s customer credit system in 2-3 years and customer Survey by Third Party Independent Agent employed by LORDSTEELTM to control the financial risky here by LORDSTEELTM Financial Department. | |
7. How to involved in LORDSTEELTM‘s global sole agents system? | |
LORDSTEELTM global agents’ application requirements in areas can has their own financial system and get technique supports from LORDSTEELTM team. |