Full Automatic Coconut Water Production Line / Filler / Machine
USD $20,000 - $50,000 /Set
Min.Order:1 Set
Zhangjiagang King Machine Co., Ltd.
Full Automatic Coconut Water Production Line / Filler / Machine
Product Name | Full Automatic Coconut Water Production Line / Filler / Machine |
Item Type | Juice filling machine |
Place of Origin | Jiangsu, China (Mainland) |
Material | SUS 304 |
Voltage | 220V/380V/440V or customized |
Power | 4.4~10KW |
Dimension | Customized |
Weight | According to different model |
Capacity | 1500-150000bph |
After-sales Service Provided | Engineers available to service machinery overseas |
Bottle type | circular or square PET or plastic |
Bottle Diameter | 50-115mm |
Bottle Height | 160-320mm |
Bottle valume | 0.25-2L |
Suitable bottle | Plastic, glass |
Application | Beverage filling |
Certification | CE SGS ISO |
Warranty | 1 year |
RCGF series 3-in-1 set of machine is mainly used in the beverage filling process. The machine combines washing, filling and capping with complete automation, suitable for filling juice and tea beverage. With temperature controller, it can also conduct thermal filling. It is used for all kinds of bottles. The bottle neck hanging technology makes the process of changing bottles easily by only adapting the height of conveyor chain. The filling process adopts hot filling technology with water-supplying system under constant pressure, which makes filling process faster and more stable. Compared with other equipment of same kind, this machine with a better quality and thus enjoys a high ratio of function against price. The hot filling type machine works with balanced tank and vacuum system.
The juice filling machine used in the beverage filling operations. The three functions of bottle wash, fill and seal are composed in one body of the machine. The whole process is automatic.
Model | Washing heads | Filling heads | Capping heads | Capacity 500ml(bph) | Bottle size (L) |
RCGF14-12-4 | 14 | 12 | 4 | 1500 bph | 0.25-2L |
RCGF16-16-5 | 16 | 16 | 5 | 3000 bph | 0.35-2L |
RCGF18-18-6 | 18 | 18 | 6 | 4000-5000bph | 0.35-2L |
RCGF24-24-8 | 24 | 24 | 8 | 8000-9000bph | 0.35-2L |
RCGF32-32-10 | 32 | 32 | 10 | 10000-120000bph | 0.35-2L |
RCGF40-40-10 | 40 | 40 | 10 | 14000-150000bph | 0.35-2L |
You can also customize the size you need |
1.Using the wind sent access and move wheel in the bottle directly connected technology; canceled screw and conveyor chains, this enable the change the bottle-shaped become easier.
2. Bottles transmission adopt clip bottleneck technology, bottle-shaped transform not need to adjust the equipment level, only change related the curved plate, wheel and nylon parts is enough..
3. The specially designed stainless steel bottle washing machine clip is solid and durable, no touch with the screw location of bottle mouth to avoid secondary pollution.
4. High-speed large gravity flow valve filling valve, filling fast, filling accurate and no liquid lose.
5. Spiraling decline when output bottle, transform bottle shape no need to adjust the height of conveyor chains.
6. Host adopt advanced PLC automatic control technology, the key electrical components from famous company such as Japan's Mitsubishi, France Schneider, Siemens.
Zhangjiagang King Machine Co., Ltd,is a direct manufacturer and exporter specializing in water treatment plants, beverage filling machine, packing machine, bottle blowing machine, injection moulding machine and spare parts of filling line.
Our factory was established in the year of 1995, with the long history of accumulated experience in filling machine industry in south Jiangsu. There are many development engineer of filling machine in our company. We devote ourselves to the development, research and production of liquid food and beverage packing and filling industry.
King Machine cooperated with many customers in recent years, we win the trust of customers from our high-quality products. And we are looking forward to the future cooperation with you if our products can impress you deeply.
1. We send the engineers to help installing, commissioning and training, the engineers start from our factory area.
2. We supply below necessary documents with the machine:
a. Machine layout
b. Electricity diagram
c. Machine certificate
d. General manual book/maintenance book