254mm ERW Steel Welded Pipe Production Line
USD $100,000 - $180,000 /Set
Min.Order:1 Set
Nanjing Zhongqing Machine Making Co., Ltd.
ERW Steel Welded Pipe Production Line
ZQMC-254
254 Parameters:
Specification: | Φ245×10 |
Pipe Diameter: | Φ89~Φ245mm |
Pipe Thickness: | 3~12mm |
Pipe Materials: | Q195,Q215,Q235 |
Welding Speed: | 10~30M/Min |
Raw material
Thickness | 5.0~12.7mm |
Width | 350~1050 mm |
Coil weight | 20~25t |
Coil ID | Φ760 mm |
Material | Q235;Q345B;J55;X70; |
Welding speed schedule:
t D | 5.0mm | 8.0mm | 10.0mm | 12.7mm |
114mm | 40 | 30 | 20 | 18 |
168mm | 35 | 25 | 19 | 17 |
219mm | 28 | 21 | 18 | 16 |
254mm | 25 | 20 | 18 | 15 |
API model mainly produces high level steel pipes, such as delivery pipe of petroleum and natural gas, oil well casing and so on. The requirements for material and quality are very strict. The mill is equipped with section equipment and technological equipment, such as IF annealing, air-cooled roll table, ultrasonic inspection, high pressure hydraulic pressure testing machine and so on.
National standard model mainly produces the steel pipe, such as water-gas pipe, structure pipe and so on.
Forming and sizing unit uses combination of FF forming and FFX forming to produce steel pipes through HF induction welding. Heating method uses HF induction or contact welding, i.e. steel pipe fed into the mill is formed into pipe profile by forming rolls. With skin effect and proximity effect of high frequency current, induced electricity is concentrated onto the bonding surface of the pipe profile fringe to heat it up quickly to welding temperature, and finishes pressure welding when pipe fringes squeezed together by squeezing roll. After normalizing, cooling, sizing and primary straightening, steel pipe of desired size is produced.
Advantage of the line:
More shared rolls, easy adjustment, high quality weld seam, sturdy machine frame, easy operation and maintenance.
Total power distribution capacity: suggested 2000KW 2 sets
Crown block allocation: one 30 T crown block for feeding, two 10 T crown block for producing.
Delivery:
Within 8 months from the date after signature of the contract and receipt of the downpayment.
Warranty:
The warranty will cover a period of one year starting from delivery for machines under normal operation conditions (Force Majeure excluded)