LW1200 Roll Forming Machine
Negotiable /Set
Min.Order:1 Set
Nanjing Zhongqing Machine Making Co., Ltd.
Cold Roll Forming Machine
LW-1200
About us
We supply roll forming machines with good quality, low prices and good service after sales,and other pipe making machines for processing round, square and rectangle pipes.
We are capable of producing various round pipes, special section pipes, cable conduits, delivery pipes, as well as roll formed sections including automobile door frame, highway side rail plates and briging brackets on the same production line.
Production process : According to customer requirements, the design uses proven and reliable principal equipment of superior performance wherever possible to produce high precision products of dimensional tolerance meeting national standard at low cost to improve market competitiveness of products.
Loading--Uncoiling--leveling--cutting & butter welding--pre-punching --forming--straightting--sizing & cutting--roll table--turn over the material--palletizing & packing
Production process flow
Loading---Uncoiling---leveling---cutting & butter welding---pre-punching ---forming---straighting---sizing & cutting---roll table---turn over the material---palletizing & packing
Electric power supply
Single phase: 220V +/- 5%. 50Hz
Three phase: 380V +/- 5%. 50Hz
Direction:Right to Left.
LW1200 Roll Forming Line Parameters
Specification | LW1200×19.5 |
Max. Width | 1200mm |
Thickness | 4.0~19.5mm |
Materials | Q235,Q345B,Q420 |
Welding Speed: | 10~36M/Min |
We welcome you to visit our factory, youll find your trip is worthy !
Delivery and payment item
Within 5 months after received 30% advanced payment, before delivery should pay 90% of the contract value. The balance payment should be paid within 6 months after debugging.
Installation and commission
1 The supplier will guide the installation and carry out commissioning, and will in charge of the rolls producing and settle the questions with the client to ensure the accuracy between rolls and equipment, finally to producing the qualified profile that this scheme appointed.
2 The supplier should supply the install files within two months after the contract take into effect.
3 The factory building, equipment foundation, and cooling pool supplied by buyer , according to suppiler’s data. The installation required tool (lifting equipment, tool, ect.), the auxiliary material (wire, tubing, pipe, etc.), labor by the buyer to arrange.
4 The buyer should supply the water, electric, gas to the equipment interface.