Leader Formwork System used wall formwok
Negotiable /Set
Min.Order:1 Set
Guangzhou Leader Equipment Ltd.
Guangzhou Leader Equipment Ltd. will attend the BAUMA 2014 exhibition in
Shang Hai,China
Our booth is Hall 3.W3.518 From 25th-28th November,2014.
NO-1 4 start screw Design. Collar screw enables height adjustment of 36mm for each revolution which is 25% faster
and 3 times in adjusting efficiency compared to adjustment for conventional steel prop.
NO-2 The inner tube equipped with indication or measuring tape allowing
fast preadjustment and reduce laborious time spent on measuring and leveling.
NO-3 U Head we can either supply an adapter or our self interlocking connector
for more fast and efficient mounting."
NO-4 Our prop loading capability is far beyond slab loading requirement and
additional bracing not require"
NO-5 Our flexible wedge lock design which can be mounted at any position/height of
the prop and able to fit in either the outer tube or the inner tube individually or simultaneously."
NO-6 Testing result deviation much exceed the standard requirement
Leader prop single with height up to 6.25m.
NO-7 The outer tube are power coated to avoid concrete adhering.The inner tube pattern
and threading design ensuring self concrete cleaning function and the collar screw
running free without jam even at extremely contaminated condition.
NO-8 Leader prop have higher loading,flexible adjustment,easiest utilization, more capability ,better designs etc.
NO-9 Leader prop are SGS certified to be in compliance to standard AS3610-1995 formwork for concrete
NO-10 Can be utilized in conjunction with LEADER GN50 Tubular Aluminum Scaffolding System as facade/Suspend Scaffold.
LEADER Aluminum Shoring and Panel Slab Formwork System
The light weight aluminum shoring system provides safe, reliable and high load bearing capacity, ample construction working spacing, simple operation, minimize labor, storage and transportation cost. The system can be utilized together with the unique “LEADER” Universal Aluminum Scaffolding System to obtain best performance with highest in the construction industry.
LEADER Universal Aluminum Shoring System is the best substitution for the heavy weight conventional steel props.
Aluminum Shoring and Panel Slab Formwork System
Prop Model | AMP120 | AMP250 | AMP350 | AMP480 | AMP625 |
L min(mm) | 800 | 1450 | 1980 | 2600 | 4300 |
L max(mm) | 1200 | 2500 | 3500 | 4800 | 6250 |
Outer tube length (mm) | 715 | 1365 | 1865 | 2515 | 4211 |
Inner tube length (mm) | 421 | 1071 | 1571 | 2221 | 1975 |
Weight kg | 10.9 | 15.5 | 19.3 | 24.3 | 34.1 |
Min~Max Load KN | 70~90 | 60~70 | 42~88 | 25~85 | 20~56 |