gas-electric set
USD $30000.00 - $30000.00 /Set
Min.Order:1 Set
Shandong Zhongneng Power Co., Ltd.
A) Adapt medium speed gas engines with 500-1000, stable operation, low temperature, low fault rate, reliable operation, standby power high, low maintenance cost, can be 30 days continuous work without stopping.
B) Using Siemens generator, international brand, quality is good.
C) Using German imported electronic ignition system.
D)With German imported high speed control system.
BRIEF INTRODUCTION
Zhongneng Power’s coal gasification system (abbreviated as CGPS) is a kind of advanced power generating system integrating coal gasification technology and efficient gas engine. CGPS includes coal gasification (coal gasifier) and purification (detarrer, desurfuration equipment) and coal gas power generating(coal gas engine). Waste heat boiler and steam turbine may also be chosen to make a gas-steam combined cycle power generating system.
The process of CGPS : Coal is converted to low BTU coal gas. Sulfur content, nitrogen oxides, dust are removed in the coal gas purification section. The clean coal gas is then fired to generate electricity in gas engine. Exhaust gas of gas engine may be used by waste heat boiler to produce hot water or steam, which may be used in lithium bromide chiller.
Our company has first-class infrastructure and international advanced production devices. Company covers an area of 48000 square meters, workshop construction area is28000 square meters; fixed asset is 150 million RMB. We have many international advanced devices, such as HEXAGON three-coordinated measuring instrument, LEICA laser tracker, ultrasonic fault detectors,2 sets of Germany-made CNC floor type boring and milling machine ,1 set of Japan-made CNC machining center,3sets of large gantry milling machine,60 sets of imported vertical and horizontal CNC machining center,400 sets of machine processing equipment.
Imported floor type boring and milling machine
Imorted Pentahedron Machine Center
our certificates