Easy Operation Soft Drink Bottling Machine
1. Automatic soft drink bottling machine sing the wind sent access and move wheel in the bottle directly connected technology; canceled screw and conveyor chains, this enable the change the bottle-shaped become easier.
2. Bottles transmission adopt clip bottleneck technology, bottle-shaped transform not need to adjust the equipment level, only change related the curved plate, wheel and nylon parts is enough..
3. The specially designed stainless steel bottle washing machine clip is solid and durable, no touch with the screw location of bottle mouth to avoid secondary pollution.
4. High-speed large gravity flow valve filling valve, filling fast, filling accurate and no liquid lose.
5. Spiraling decline when output bottle, transform bottle shape no need to adjust the height of conveyor chains.
6.Our soft drink bottling machine adopts advanced PLC automatic control technology, the key electrical components from famous company such as Japan's Mitsubishi, France Schneider, OMRON.
3 In 1 Unit of Soft Drink Bottling Machine
Washing Part of Soft Drink Bottling Machine
Filling Part of Soft Drink Bottling Machine
Capping Part of Soft Drink Bottling Machine
Enquiry | contact us by email, phone call, fax, Instant tools (Trademanager, MSN, Skype) and let us know your |
Discussion | specify the items you desire, confirm specification; OEM/ODM consultation. |
Quotation | Prices offered and accepted. |
Place Order | as per contract or discussion. |
Proforma Invoice | offered to double confirm the order for both-side records. |
Payment settled | Mineral water bottle equipment |
Order Completed | under our arrangement. |
Goods Shipped | as per contracted term. |
Goods Arrive | at local port or warehouse, depending on contracted term. |
Q1:Are you a trading company or a manufactory?
A1:We are a manufactory,can give u best service .
Q2:What’s your guarantee or the warranty of the quality if we buy your machines?
A2:We offer you high quality machines with 2 years guarantee . we will give u spare part free in 2 years.
Q3:When can I get my machine after I paid?
A3:We will deliver the machines on time as the date we agreed both side.
Q4:How can I install my machine when it arrives?
A4:We will send our engineer to your side as soon as you get all your machines ready , for testing and teaching your technicians how to run the machines.
Q5:How about the spare parts?
A5:After we deal down all the things , we will offer you a spare parts list for your reference
We Warmly Welcome Customers All Over The World To Our Company.If
You Have Interests In Our Products,Please Contact Us FREELY!
ZHANGJIAGANG RELIABLE MACHINERY CO.,LTD