Glass Bottle Beer Depalletizing Machinery
Negotiable /Cubic Meter
Min.Order:1 Cubic Meter
Jiangsu HY-Filling Packaging Machinery Co., Ltd.
Glass Bottle Depalletizer-HY Filling
1) CE certificate
2) ISO9000: 2000 Certificate
3) Volume: 0.25-2.5L
4) Can ,glass bottle
5) Automatic system
6) High efficiency , easy maintenance
General description
The depalletizer is new style one which is researched and developed by absorbing advanced technology aboard. It is suitable for different medium and large beer filling production line, some functions will be changed or added according to the customer's actual requirement. The machine features as easy operation, smooth running, large output and easy maintenance.
Technical parameters
Capacity: | 10,000CPH |
Power: | 1.65KW |
Specification of pile: | 1200×1200×150mm |
Height of pallet | 2300mm |
Height of can conveying chain: | 3500mm |
Dimensions: | L×W×H=6200×4700×3100 (mm) |
Weight: | 5000Kg |
Technical parameters
Capacity: | 18,000CPH |
Power: | 1.85KW |
Specification of pile: | 1400×1200×150mm |
Height of pallet | 2300mm |
Height of can conveying chain: | 3500mm |
Dimensions: | L×W×H=7200×4700×3100 (mm) |
Weight: | 5000Kg |
Main structures
1) This machine is composed of lift, transfer table, can pushing part, roller 1, roller 2 and operation platform.
2) Elevating part
3) Lift is used for lifting pallets to the height of transfer table and pushing cans to the transfer table by can push parts.
4) Transfer table
5) This part is used for can storage and transport.
6) Can pushing parts
7) It is used for pushing cans to transfer table from pallet.
8) Roller 1 and roller 2
9) They are used for pallet transport.
Main composition
1) Main rack Carbon steel &stainless steel
2) PLC SIEMENS
3) Photo switch Sick
4) Switch SCHNEIDER
5) Contactor SIEMENS
Installation and commissioning
After the equipments arrived buyer's workshop, the buyer should take it's place for each equipment according to the supplied layout; the seller will send the experienced technician to guide the installation and debugging and trail production, and fulfil the designed capability within the designed time. The installation, debugging and training is about 30-35 days.
Training
The seller will supply technical training to the buyer. The training is includes: equipment structure and maintenance, control and operation. After training, the technicians of the buyer will grasp relevant operation and maintenance skills, and could adjust the technologies more skilled, and can deal with all kinds of malfunction in time.
After-sales service
1) After qualified of the equipment, the seller will supply one year guarantee, control system one year guarantee, free charge for wearing parts, and other spare parts with cost price. Within guarantee period, the technicians who accepted training should strictly obey the requirements asked by the seller to operate the equipments and maintenance, to find the common malfunctions and fault clearing in time; if the technicians of the buyer couldn't solve the problems themselves, the after-sales department will supply long range guide service by phone; if relevant measurements couldn't solve the problems, the seller will send the technicians to the buyer factory, clear the fault or relevant technical problems on site, the charges will reference to the installation and debugging charges.
2) After guaranteed, the seller will supply widely favorable technical support, after-sales service for the lifetime: favorable price for the wearing parts and other spare parts.