CO2 production equipment
CO2 production equipment
CO2 production equipment
CO2 production equipment
CO2 production equipment
CO2 production equipment

CO2 production equipment

Negotiable /Cubic Centimeter

Min.Order:1 Cubic Centimeter

Supply Ability:
1 Cubic Centimeter / Cubic Centimeters per Month
Port:
Shanghai

Quick Details View All >

Condition:
New
Application:
Beverage
Packaging Type:
Bottles
Packaging Material:
Glass
Automatic Grade:
Automatic
Driven Type:
Electric

Jiangsu HY-Filling Packaging Machinery Co., Ltd.

Business Type: Manufacturer,Trading Company
Jiangsu China
Main Products: Filling Machine Water Filling Line ,Juice/Tea Beverage Filling Line ,Glass Bottle Filling Line ,Can Filling Line ,CSD Filling Line

Product Details

 

Product Description

 

Device CO2 recycling fermentation gas (RBU) is the wine fermentation by some chemical processes enriched CO2.

CO2 recovery device through the appropriate cleaning, washing, filtration and separation technology to achieve high quality CO2.

CO2 production equipment with the control panel, to ensure trouble free operation. All instrumentation installation and transportation convenient in the shell inside the block, reduce, on-site installation, debugging time.

CO2 gas release in the alcoholic fermentation process contains a large number of impurities, first through the demister for removing foam. Demister then scrubber.

Raw gas by alcohol and aerosol CO2 gas scrubber in the later removed, water is transported to the demister recycling. CO2 gas NOX removal by Potassium Permanganate scrubber, followed by a wash, the rest of the impurities removal by water.

CO2 gas through the two grade oil free compressor is equipped with CO2 in / out cooler is compressed to about 20bar. CO2 compressor through the airbag volume control.

The CO2 gas is compressed by removing odor and volatile compounds of double active carbon filter. Activated carbon filter is regenerated by steam or hot CO2. The two filter in parallel to ensure that the regeneration of uninterrupted operation process.

CO2 compressed gas in the dryer drying to the dew point temperature of -60 DEG C, the dryer through from the inert gas CO2 condenser to the equivalent of non condensable gas purging system automatic regeneration by electrical heating.

By purification and drying of CO2 gas through the shell and tube heat exchanger were liquefied under the temperature of -18 DEG C. At the same time supporting the fluorine refrigerating compressor set. To ensure correct operation pressure of CO2 condenser.

Liquid cryogenic CO2 is fed into the CO2 storage tank.

 

CO2 Recovery Plant uses Industrial waste gas(including tail gas after fermentation, combustion, chemical synthesis or the Petroleum waste gas) as raw material, collecting pure CO2 from these tail gases by using of kinds of physical and chemical methods. The purity of CO2 production can reach industrial,f ood and even electronic grade.

CO2 recovery equipment makes full use of the CO2 produced in the process of cement, chemical fertilizer, alcohol, hydrogen production, and electricity generation,e tc. Therefore, the equipment can effectively reduce the emission of CO2,and produce food-grade and industrial-grade CO2.  Due to its environmental friendliness, our CO2 recovery plant has widely applied in the industries of beverage, welding, fire extinction, greenhouse agriculture, oil field, food storage, etc. Thus, it can help effectively control green house effect.

Our company is able to design according to the technical conditions offered by customers, reaching the target of simply techniques low investment, low energy consumption, low cost and high yield quantity

 

 

Packaging & Shipping

 

 

 

 

 

Our Services

 

 

Installation and commissioning

After the equipments arrived buyer's workshop, the buyer should take it's place for each equipment according to the supplied layout; the seller will send the experienced technician to guide the installation and debugging and trail production, and fulfil the designed capability within the designed time. The installation, debugging and training is about 30-35 days.

 

Training                            

The seller will supply technical training to the buyer. The training is includes: equipment structure and maintenance, control and operation. After training, the technicians of the buyer will grasp relevant operation and maintenance skills, and could adjust the technologies more skilled, and can deal with all kinds of malfunction in time.

 

After-sales service

1) After qualified of the equipment, the seller will supply one year guarantee, control system one year guarantee, free charge for wearing parts, and other spare parts with cost price. Within guarantee period, the technicians who accepted training should strictly obey the requirements asked by the seller to operate the equipments and maintenance, to find the common malfunctions and fault clearing in time; if the technicians of the buyer couldn't solve the problems themselves, the after-sales department will supply long range guide service by phone; if relevant measurements couldn't solve the problems, the seller will send the technicians to the buyer factory, clear the fault or relevant technical problems on site, the charges will reference to the installation and debugging charges.

2) After guaranteed, the seller will supply widely favorable technical support, after-sales service for the lifetime: favorable price for the wearing parts and other spare parts.


 

 

 

Contact Supplier

Mr. Weidong Yin General Manager Chat Now
Telephone
0086-512-56302185
Mobile
0086-13913617685
Fax
86-512-56302182
Address
No. Z2104 of Huachang Oriental Plaza, No.11 of Renming Road (E) Jiangsu

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Packaging Machine > Other Packaging Machines
Categories
Hi~