Amoco Biogas Holder on Digester / double membrane / 0-10000m3 Capacity Customized

Amoco Biogas Holder on Digester / double membrane / 0-10000m3 Capacity Customized

USD $10,000 - $100,000 /Set

Min.Order:1 Set

Supply Ability:
30 Set / Sets per Month
Port:
Shanghai
Payment Terms:
T/T

Quick Details View All >

Place of Origin:
Sichuan, China
Brand Name:
DANTIAN
Model Number:
AMB
Type:
Other, BIOGAS COLLECTOR

Chengdu Amoco Architecture Technology Co., Ltd.

Business Type: Manufacturer
Chengdu Sichuan China
Main Products: Membrane Gas Holder ,Membrane Gas Storage Tank ,Membrane Gas Storage System ,Biogas Container ,Membrane Gas Roof

Product Details

Specifications

Long service life
Maintenance free set-up
Permanently gas tight
Suitable for heavy wind and snow loads
Low maintenance costs

Advantages:

 

1. It can store large amount of biogas.

2. The biogas tank combined with fermentation cylinder, this saves cost.

3. We have our autocontrol system, with pressure and volume display on the control box.

 

Gas specific-membrane details:

 

Double membrane gas holder is made of  high-strengthened, high-elastic synthetic engineering membrane and of perfect anti-acid and anti-corrosion ability. The biogas specific membrane had been widely used in foreign energy treatment,  sewage treatment and other industries. This has been tested that the service life is at least 15 years. 

 

                 Amoco Biogas Holder on Digester / double membrane / 0-10000m3 Capacity Customized

                Amoco Biogas Holder on Digester / double membrane / 0-10000m3 Capacity Customized 

 

 

 Pictures of Amoco biogas holder projects:

 

       Amoco Biogas Holder on Digester / double membrane / 0-10000m3 Capacity Customized       Amoco Biogas Holder on Digester / double membrane / 0-10000m3 Capacity Customized

 

WHICH COSTS DO I HAVE TO TAKE INTO ACCOUNT?

 

In terms of economic evaluation of a storage system, not only the initial investment and the running costs play a major role, but also the replacement investment and opportunity costs are to be considered. Opportunity costs arise from lesser yields in power and heat generation and from a higher use of substrate in less suitable storage systems. The highest costs arise when the CHP (combined heat & power) does not operate at full capacity! These opportunity costs can exceed the initial costs of the biogas storage tank after only a few years of operation.

Contact Supplier

Mr. Hao Zhang Chat Now
Telephone
86-28-85458086
Mobile
13808031882
Fax
0086-28-85431144-886
Address
B-1404#,Huaxi Building,Linyin Street,Chengdu,Sichuan,China Chengdu,Sichuan

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Environment > Waste Management
Categories
Hi~