PET Strap production line/Plastic strap band production line
USD $70,000 - $180,000 /Set
Min.Order:1 Set
Zhangjiagang Mooge Machinery Co., Ltd.
This production line is used to producr the pet packing band,pet packing strap;adopt the plc control the whole line do the auotmatic production,it use the melting pump and pressure sensor ensure the production stable and strap quality control the raw material you can use is 100% recycled pet flakes from the waste pet bottles,or virgin material or mixed with each other
No | Name | Qty. |
1 | Vacuum loader | 1set |
2 | Dehumidify dryer | 1set |
3 | Single screw extruder | 1set |
4 | Hydraulic screen exchanger | 1set |
5 | Melt pump | 1set |
6 | Mould | 1set |
7 | Water tank cooling system | 1set |
8 | Haul-off machine | 1set |
9 | Heating oven | 1set |
10 | Preheating machine | 1set |
11 | Drawing machine | 1set |
12 | Embossing machine | 1set |
13 | Hot forming machine | 1set |
14 | Haul-off | 1set |
15 | Winder (double position) | 2sets |
16 | Chiller | 1set |
17 | Mould temperature controller | 2sets |
Model | Capactity(kg/h) | Strap Size | Install power | Manpower | Diemension |
SJ65/33 Single Strap | 50~60 | 9~19mm | 85kw | 1~2 | 35MX4MX5M |
SJ75/33 Single Strap | 80~100 | 9~19mm | 100kw | 1~2 | 38MX4MX6M |
SJ75/33 Double Strap | 80~120 | 9~19mm | 110kw | 1~2 | 40MX4MX6M |
SJ90/33 Double Strap | 120~150 | 9~19mm | 150kw | 1~2 | 45MX5MX7M |
SJ120/33 Double Strap | 150~200 | 9~25mm | 220kw | 1~2 | 45MX5MX7M |
PET Strap production line pictures:
1. For the loose cargo we will packing by wooden box
2. For the full container loading we are packing the machine by film and some on pallet accordingly
3. We can shipping the goods by air or by sea
4. We will send pictures of cargo loading to our client to check and keep recording
5. We can send cargo to client’s warehouse to loading
1.Pre-sale: we given client the details technician offer, sign the sales contract etc.
2.In-sales: we supply the details layout, installation instruction, technician support for the clients.
3.After sales: we arrange engineer to install the machinery and training the workers for client.
4.We have 24hours team to solve the after sales problem.
5.We have free spare parts with the machine.
6.We supply long term spare parts for every customer.
7.We always up date the new technology to every customer.
1- How to choose proper products you want?
Please tell us as detail as what you want
What’s your raw material it is
What’s the final products you want to produce
What capacity you want it performance
2- How to control the quality?
We have technical, engineer team design the sample machinery before enter into market
Production QC team ensure the machine manufacturing quality
We will running every machine after finished before shipment
Optional choose by client running the machinery by material