Material X70 LSAW anti-corrosion pe jacket Polyurethane Foam Insulation Pipe
Material X70 LSAW anti-corrosion pe jacket Polyurethane Foam Insulation Pipe
Material X70 LSAW anti-corrosion pe jacket Polyurethane Foam Insulation Pipe

Material X70 LSAW anti-corrosion pe jacket Polyurethane Foam Insulation Pipe

USD $730 - $800 /Ton

Min.Order:25 Tons

Supply Ability:
1000 Ton / Tons per Month
Port:
XINGANG
Payment Terms:
T/T Credit Card

Quick Details View All >

Thickness:
3, 20
Section Shape:
Round
Outer Diameter:
219 - 1420 mm
Place of Origin:
Hebei, China
Secondary Or Not:
Non-secondary
Application:
Fluid Pipe

Hebei Top-Metal I/E Co., Ltd.

Business Type: Trading Company
Shijiazhuang Hebei China
Main Products: Steel flange ,butt welding pipe fittings ,seamless pipe ,forged pipe fittings ,LSAW pipe

Product Details

Structure of polyurethane insulation pipe

 

 

Production process

 

 

 

 

1. Shot blasting process

Shot blasting treatment is necessary before foaming.

First, this process polished outer surface of the qualified pipes,remove the oxide,dust and oil stain of the pipe surface

Then increase adhesion of the pipe.

Last,It improved the adhensive strength between the polyurethane insulation layer and the pipe.

 

 

2.Electric corona treatment process

Electrode corona process carry out the principle of high pressure electrode discharge. To make electric corona treatment for the inner surface of PE pipes.

 

 

 

 

3.Polyurethane foam

We use PU600 high-pressure foam machine.and its capacity of injection materials reaches 600L/min, pressure of injection material  reaches 30MPa.Our polyurethane raw material is from Bayer Company in German.Which is fluorine-free products with best quality. Also it  meet all the data of our chinese Ministry of Construction and European standards. , it can continously working under the temperature  148℃ and more than 30 years’s life..

 

4.Sweating soldering process

Firstly, this process makes the V type welding junction melted.at the same time, Under the pressure of welding machine, it makes the extruded melted PE to be welded tightly on the junction.

 

 

5.Hot plate welding process

According to the principle of PE sweating soldering, to preheat the junction of the pipe with different angles on the hot plate. after it reaches the resonable temperature.quickly exert the axial pressure on the pipes to enable the melted pipe orifice be welded perfect.

 

 

6.Electric sweating soldering interface process

Through the method of electrical heating, the joint coupling can be used with PE outer protecting pipes, which has high welding strngth, and is applicable for the construction that adopts various laying direct-buried prefabricated insulation pipe joints.

 

Contact Supplier

Mr. Liang Guo CEO Chat Now
Telephone
86-311-68002652
Mobile
13784301192
Fax
86-311-87055012
Address
6th Floor, Block A ,Zhongliang Hebei Plaza. No.345 Youyi North Street Shijiazhuang,Hebei

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Pipes
Categories
Hi~