S40 A234WPB Carbon Steel Equal Tee
USD $300 - $500 /Ton
Min.Order:5 Tons
Hebei Haihao Group Steel Pipe Engineering Co., Ltd.
S40 A234WPB Carbon Steel Equal Tee
Type | Equal Tee,Reducing Tee,Lateral Tee |
Size | 1/2"- 48" |
Wall thickness | Sch 20- Sch 160 |
Connection | Butt-welding |
Surface | anti rust black painted, anti rust oil, galvanizing |
Material | Carbon steel: ASTM A106 GRB/ A53 GRB/ API 5L GRB/A335/ST37/ST52 Alloy steel: ASTM/ASME A234 WP 1-WP 12-WP 11-WP 22-WP 5-WP 91-WP 911 Stainless steel: ASTM/ASME A403 WP 304-304L-304H-304LN-304N ASTM/ASME A403 WP 316-316L-316H-316LN-316N-316Ti ASTM/ASME A403 WP 321-321H ASTM/ASME A403 WP 347-347H |
Standards | ASME/ANSI B16.9/B16.11/B16.28 MSS SP-43/SP-83 GOST17378-2001/17376-2001/17375-2001 JIS B2311/B2313/B2316 DIN2605 BS1740.1,BS1965 ,BS1640,BS3799 |
Question 1: How many staff working on your plant?
Answer: 660 workers and staff members with a strong technical force, including 26 engineers, 48 assistant engineers and 68 technicians.
Question 2: What kind of certificate do you have?
Answer: ISO,API,ABS CERTIFICATES.
Question 3: What market experiences do you have?
Answer: We have experiences of working in Russia,USA ,Germany Korea,Vietnam, India ,Indonesia, Malaysia, Philippines,Iran, Kazakhstan, Romania, Costa Rica, Georgia, Kuwait,Turkmenistan, Ukraine and Jordan etc. market.
Question 4: What kind of largest diameter seamless and welded pipe fittings available to producing in your workshops ?
Answer: ELBOW( largest diameter seamless 30",welded 96" )
TEE( largest diameter seamless 24",welded 96" )
REDUCER( largest diameter seamless 24",welded 96" )
Question 5: Do you have the laboratory in your factory?
Answer: Yes, we have.
Question 6: Can you supply FASTENERS?
Answer: Yes, we can supply Bolt, U-bolt and screw nut.
Question 7: What test do you usually do?
Answer: After production, we will make NDT inspection. About elbows, usually we use ultrasonic test by a certain percentage. If client needs special requirement,we will make as per their requirement.
Question 8: The period of production a volume about 300 tn of products;
Answer: About 300 tons products, it costs 20-30 days,and 40 days including painting,marking and packing.
Question 9: The whole production capacity of your own production facilities;
Answer: About DN15-DN6000 flange,18000 tons per year;DN15-DN1200 elbow, reducer and tee,15000 tons per year.