Carbon Steel ASTM A105 Pipe Orifice Flanges
Carbon Steel ASTM A105 Pipe Orifice Flanges
Carbon Steel ASTM A105 Pipe Orifice Flanges
Carbon Steel ASTM A105 Pipe Orifice Flanges
Carbon Steel ASTM A105 Pipe Orifice Flanges
Carbon Steel ASTM A105 Pipe Orifice Flanges

Carbon Steel ASTM A105 Pipe Orifice Flanges

USD $1.2 - $80 /Piece

Min.Order:1 Piece

Supply Ability:
2000 Ton / Tons per Month
Port:
Tianjin Xingang Port
Payment Terms:
T/T Credit Card PayPal

Quick Details View All >

Size:
DN15-DN1800
Material:
Other, Carbon Steel,Stainless Steel,Alloy Steel
Standard:
Other, ANSI/ASTM/JIS/GOST/DIN/STD
Place of Origin:
Hebei, China
Model Number:
HH-Orifice Flange
Brand Name:
HH

Hebei Haihao Group Steel Pipe Engineering Co., Ltd.

Business Type: Manufacturer
Cangzhou Hebei China
Main Products: Steel pipe ,weld pipe ,seamless pipe ,api pipe ,carbon steel pipe

Product Details

 
Haihao Product
HAIHAO PRODUCT
Carbon Steel ASTM A105 Pipe Orifice FlangesCarbon Steel ASTM A105 Pipe Orifice FlangesCarbon Steel ASTM A105 Pipe Orifice FlangesCarbon Steel ASTM A105 Pipe Orifice Flanges
FLANGEPIPE FITTINGSSTEEL PIPEOTHER FITTINGS
Product Description

 Carbon Steel ASTM A105 Pipe Orifice Flanges

We will Reply you within 24 hours

 Products

pipes,Flange,Elbows, Tees, Reducers, Pipe Caps, Bends,butt welding fittings,pipe fitting

 Material

Carbon steel --ASTM A234WPB,,A234WPC,A420WPL6. 20#,Q235,10#, A3, Q235A,   20G,16Mn,  DIN St37, St45.8, St52.4,St.35.8,St.35.8 ASTM A333 GR.6 ; API 5L GRB, X60, X65, X42,X52, ect

 

Stainless Steel --ASTM A403 WP304,304L,316,316L,321. 1Cr18Ni9Ti, 00Cr19Ni10,00Cr17Ni14Mo2, etc

 

Alloy Steel --ASTM A234 WP12,WP11,WP22,WP5,WP9,WP91,16MnR, Cr5Mo, 12Cr1MoV,  10CrMo910,15CrMo, 12Cr2Mo1; ASTM A335 P5, P9, P11, P12, P22, P91 ASTM A860 WPHY 70, WPHY 65, WPHY 60, WPHY 52,WPHY 46,WPHY 42, etc

 StandardASTM / JIS / DIN / BS / GB / GOST
 Size1/2inch~~ 48inch
 ThicknessSCH10,SCH20,SCH30,STD SCH40, SCH60, XS, SCH80., SCH100, SCH120, SCH140, SCH160, XXS
 Certification

API,CE,ABS,ISO,PED Certificate Approved

 Factory LocationMengcun County, Cangzhou City, Hebei province, China
 PackingWooden cases, wooden pallets and as customers request
 Supply Ability1000 ton per month(No less than 50 container totally)
 Minimum Order10 PCS(Samples are available upon you request)
 Delivery TimeUsually Within 30 days after the order date or as your requirement
 PaymentL/C at sight, T/T ,D/P
 Our main marketMid East, Southeast Asia , India, Europe and South America
 Export QuatityMore than 20 containers per month
 InspectionDirect reading light spectrum, hydrostatic test ,X-ray detector,ultrasonic flaw detection ,magnetic powder detector ,etc

Carbon Steel ASTM A105 Pipe Orifice Flanges Product Show:

 

Carbon Steel ASTM A105 Pipe Orifice Flanges

 

Carbon Steel ASTM A105 Pipe Orifice Flanges

 

Carbon Steel ASTM A105 Pipe Orifice Flanges

 

Carbon Steel ASTM A105 Pipe Orifice Flanges

 

Certificate

 

Packaging & Shipping

All goods should be packed in sea worthy export plywood cases & pallets, streched wrapped with nylon.

Carbon Steel ASTM A105 Pipe Orifice FlangesCarbon Steel ASTM A105 Pipe Orifice Flanges 

FAQ

Question 1: How many staff working on your plant? 

Answer: 660 workers and staff members with a strong technical force, including 26 engineers, 48 assistant engineers and 68 technicians.

 

Question 2:  What kind of certificate do you have?

Answer: ISO,API,ABS CERTIFICATES.

 

Question 3: What market experiences do you have?

Answer: We have experiences of working in  Russia,USA ,Germany Korea,Vietnam, India ,Indonesia, Malaysia, Philippines,Iran, Kazakhstan, Romania, Costa Rica, Georgia, Kuwait,Turkmenistan, Ukraine and Jordan etc. market.

 

Question 4:  What kind of largest diameter seamless and welded pipe fittings available to producing in your workshops ?

Answer: ELBOW( largest diameter seamless 30",welded 96" )

                TEE( largest diameter seamless 24",welded 96" )

                 REDUCER( largest diameter seamless 24",welded 96" )

 

Question 5: Do you have the laboratory in your factory?

Answer: Yes, we have.

 

Question 6: Can you supply FASTENERS?

Answer: Yes, we can supply Bolt, U-bolt and screw nut.

 

Question 7: What test do you usually do?

Answer: After production, we will make NDT inspection. About elbows, usually we use ultrasonic test by a certain percentage. If client needs special requirement,we will make as per their requirement.

 

Question 8: The period of production a volume about 300 tn of products;

Answer:  About 300 tons products, it costs 20-30 days,and 40 days including painting,marking and packing.

 

Question 9: The whole production capacity of your own production facilities;

Answer: About DN15-DN6000 flange,18000 tons per year;DN15-DN1200 elbow, reducer and tee,15000 tons per year.

Contact Supplier

Mr. Eric Xue Chat Now
Telephone
0086-22-58388792
Address
mengcun county Cangzhou,Hebei

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Mechanical Parts & Fabrication Services > Flanges
Categories
Hi~