double girder crane 50ton
USD $50,000 - $70,000 /Set
Min.Order:1 Set
Xinxiang Yueda Crane Co., Ltd.
LH model double girder crane(double girder EOT crane) is traveling on fixed support, The frame adopts box-type welding mechanism, and it used together with CD1/MD1 or HC/HM model electric hoist as a complete set, It is an mid-duty class crane,
This double girder crane(EOt crane) is widely used in plants, warehouses, material stocks to lift goods. It is prohibited to use the equipmenmt in the combustible, explosive to corrosives environment.
Schematic diagram
Main technical specification
Capacity | 5t,10t,15t,16t,20t,25t,30t,32t,40t,50t | |||||
Span(rail to rail center) | 7.5m~35m | |||||
Lifting height | 6m, 9m, 12m,18m or other height | |||||
Capacity | 5t | 10t | 15t, 16t | 20t, 25t | 30t, 32t | 40t, 50t |
Lifting speed(m/min) | 8, 8/0.8 | 7/0.7 | 3.5, 3.5/0.35 | 4, 4/0.4 | 3, 3/0.3 | 2, 2/0.2 |
Cross travelling speed(m/min) | 10, 20 | 10, 20 | 10, 20 | 10, 20 | 10, 20 | 10, 20 |
Long travelling speed(m/min) | 20, 30 | 20, 30 | 20, 30 | 20, 30 | 20, 30 | 20, 30 |
Duty Class | A3/A4 | |||||
Power source | 380V, 50HZ, 3 phase (or other standard) | |||||
Working temperature | -25~40°C | |||||
Control model | Cabin control, push button control or remote control |
Safety Precautions
Ø Upward and downward limit switch for hook
Ø Low-voltage protection function
Ø Phase sequence protection function
Ø Overload protection
Ø Emergency stop protection
Ø Hook with latch
Ø Rubber buffers
Product show
Control methods
Product delivery
Customers visiting
After-sale seivice
u 14 months warranty the date of B/L
u One year quick-wear parts for free
u Professional technicians provide installation, commissioning services.
u Technical advisory for any time.
Welcome select Double Girder Electric Overhead Crane and visit our factory. Our professinal engineers and technicians will serve you with all technical support.
If you are interested in our crane, please confirm the below information:
1. Capacity of crane
2. Span (the distance from rail center to rail center)
3. Lifting height (the distance from ground to hook center)
4. Industrial voltage
5. What material will you lift?
6. Crane working time per day and environment temperature
Contact way
Thanks for your brows.