China Klong Plastic gusset plate production line
USD $10,000 - $100,000 /Piece
Min.Order:1 Piece
Suzhou Kailong Machinery Co., Ltd.
Main Material | PVC & Calcium |
PVC Ratio | 35%---70% |
Thickness | 4.5mm, 5.5mm, 6mm, 6.5mm, 7mm, 7.5mm,8mm, 9mm, 10mm, 12mm |
Width | 180mm,200mm,250mm, 300mm |
Length | As per customer’s requirements |
Colors & Patterns | Diversified color and pattern |
Surface Treatment | High Glossy Printing/Transfer Printing |
It is mainly used in PVC door & window profile material, wide door plate, window
plate, extrusion of multi-holes pipe for passing through lines(four holes, six holes, seven holes nine holes, etc.). For different sectional surface
and molds, twin parallel(conical) screws extruder of different specifications can be chose together with
corresponding vacuum calibrating table, haul-off unit, cutting unit, titer, etc.
Plastic PVC ceiling panel production line's Capacity of main frame can ba optionally chosen from 60-700kgs/hour. Plastic PVC ceiling panel production line's haul-off unit has applied unique lift technique of our company. Plastic PVC ceiling panel production line work is stable, Plastic PVC ceiling panel production line reliability is good, Plastic PVC ceiling panel production line pulling force is large.
Plastic PVC ceiling panel production line's Vacuum setting has applied special enlarged vortex cooling system which is good
for cooling and calibrating so as to meet demand of high speed extruding.
Movement speed and drawing speed of cutting machine keep synchronous. All
movements are controlled by import PLC, the design is reasonable, the operation is
stable, it can conduct automatic cutting with fixed length. Powder & dust suction
device can be provided. With different molds, the tilter platform can choose such
specification as 4-meter, 6-meter, 8-meter, 11-meter, etc. With twin parallel screws extruder, Plastic PVC ceiling panel production line is particularly suitable for high speed extruding of profiled material.
SHIPMENT | 45 working days after receipt of order and down payment |
PAYMENT TERMS | - 30% T/T at sight at the order - 70% T/T at sight before delivery |
PORT OF LOADING | Shanghai, China |
PACKING | Machine will be packing by stretched film and fixed with iron wire in the standard seaworthy wooden case. |
WARRANTY | - Mechanical parts:12 months from delivery - Electric motors:6 months from delivery or manufacture's warranty - Electromechanical components and instruments:6 months from delivery or manufacture's warranty |