agglomerator machine for sale
USD $1,000 - $10,000 /Piece
Min.Order:1 Piece
Suzhou Kailong Machinery Co., Ltd.
This agglomerator is mainly used for cutting and recycling thermoplastic films, LDPE,
PP, HDPE films and garbage bags, PET flakes, Chemical fibers and so on.
Simplified feeding process with large single portions and consequently reduced feeding labour (operator cost) is another positive result of the new design.
The enlarged cutter compactor drum allows the feeding of the system with larger single portions of plastic waste without disturbing the temperature homogenity in the drum. The result is a more steady and robust overall behaviour of the plant at stable, high output rates independent from the feeding personnel.
Up to 30% increased throughput with lower melt temperature of processed material with the same extruder size. Now possible due to a considerable change in the ratio between the cutter compactor chamber volume and the extruder size (patented).
The enlarged cutter compactor chamber volume provides better precutting, a longer dwell time of the processed material in the chamber and a more even temperature homogenity of the precut, preheated plastic material fed to the extruder screw.
Consequently screws are now cut deeper and processing temperatures in the extruder are generally lower.
The superb positive result is a considerably lower melt temperature of the processed material, resulting in less heat history and better MFI of the reprocessed material at considerably higher output rates!
We are a professional manufactory in plastic recycling machine field. We offer our client ODM and OEM service. We will design the machine according to our client's request. Please contact with us for more information. We will offer you the best service and machinery with best price
MAIN TECHNICAL SPECIFICATION
Model | Rotor blades | Stator blades | Motor power | Capacity |
100L | 2 pcs | 6 pcs | 22KW | 80-100kg/hr |
200L | 2 pcs | 6 pcs | 55kw | 150-200kg/hr |
300L | 2 pcs | 8 pcs | 75kw | 200-300kg/hr |
500L | 2 pcs | 8 pcs | 90kw | 300-400kg/hr |
800L | 4 pcs | 8 pcs | 110kw | 400-600kg/hr |
SHOW OUR MACHINE FOR U:
THIS IS OUR CE CERTIFICATE:
OUR SERVICES:
SHIPMENT | 45 working days after receipt of order and down payment |
PAYMENT TERMS | - 30% T/T at sight at the order - 70% T/T at sight before delivery |
PORT OF LOADING | Shanghai, China |
PACKING | Machine will be packing by stretched film and fixed with iron wire in the standard seaworthy wooden case. |
WARRANTY | - Mechanical parts:12 months from delivery - Electric motors:6 months from delivery or manufacture's warranty - Electromechanical components and instruments:6 months from delivery or manufa |