China steel mills hollow section 4 galvanized pipe
USD $350 - $600 /Ton
Min.Order:5 Tons
Tianjin TF Steel Pipe Co., Ltd.
Product name | 4 galvanized pipe | |
Technique | Longitudinal Electronic Resistance Welding(ERW) High Frequency Welding(HFW) | |
Material Quality | Steel Grade | Q195 similar to a283 GR.B, 040a10, ss330, sphc Q235 similar to a283 GR.D, 080a15,CS type B Q345 similar to a737 GR.B, SS400, S235JR |
Material Type | Available in cold rolled and hot rolled | |
Size | W.T | 0.8mm-2.5mm |
Diameter | 32mm-114mm | |
Length | 5.8m-12m | |
Surface | Galvanized, 3PE, painting, coating oil, steel stamp, drilling, etc | |
Ends | Plain ends, cutting, threading, beveled, flange, etc | |
Packing | Packing in bundle with steel strips; with seaworthy package at the end; could be done with your requirement. | |
Inspection | With Chemical Composition and Mechanical Properties Testing; Hydrostatic Test, Dimensional and Visual Inspection, With Nondestructive Inspection | |
Certification | BV, IAF, SGS,COC, ISO or as per customer | |
Application | Urban construction pipe, machine structure pipe, agriculture equipment pipe, water and gas pipe, Greenhouse pipe, Scaffolding pipe, Building material tube, Furniture tube, Low pressure fluid tube, Oil pipe, etc | |
Trade Terms | FOB, CFR, CIF, EXW, etc. | |
Payment | L/C, D/A, D/P, T/P Western Union, MoneyGram acceptable, T/T preferred | |
Delivery Time | Usually within 10-30 days after receipt of deposit, ASAP | |
Loading Port | Xingang , Tianjin | |
Cooperation Ship-owner | MSK, CMA, MSC, HMM, COSCO, UA, NYK, OOCL, HPL, YML, MOL |
Our Services
• Your inquiry related to our product & price will be replied within 24hours.
• Well-trained & experienced staff are to answer all your inquiries professional
in English of course.
• OEM is highly welcomed. We have strong R&D team here to help.
• Your business relationship with us will be confidential to any third party.
• Good after-sale service offered, please get back if you got question
Faq
Q1: Are you a factory or trading company?
A: We are an enterprise of both professional production and large sales.
Q2: Can I get some samples?
A: Yes, we are honored to supply you free samples of steel tube.
Q3: What about your payment term?
a) T/T: 30% T/T advance, 70% balance copy of B/L
b) L/C
c) T/T and L/C: 40% T/T advance, 60% L/C
d)Two sides deliberations
Q4: What about the lead time for mass production?
A:Honestly, it depends on the order quantity and specification and the season you place the order.
Q5: What is your terms of delivery?
A:We accept EXW,FOB,CFR,CIF,etc about $keywrods$. You can choose the one which is the most convenient or cost effective for you.