Quality products hrc 1.0mm shearline steel strip manufacturers
USD $300 - $800 /Ton
Min.Order:5 Tons
Tianjin TF Steel Pipe Co., Ltd.
Mild steel regular spangle 0.7mm shearline steel strip loading
China factory hot dipped 0.75mm shearline steel strip loading
Best selling zinc coated 0.6mm shearline steel strip weight chart
China wholesale hot rolled 0.65mm shearline steel strip importer
Steel structure buildings hot rolled 0.41mm shearline steel strip factory
commodity | galvanized steel coil |
width | 600-1500mm |
thickness | 0.12-5mm |
standard | JIS G 3302-1998, ASTMA653M, GB/T 2518, Q/CHG3-2005, EN 10142, DX51D,ENG10142,SGCD(DX52D+Z) |
coil weight | 3-8tons (Can be customized) |
technique | Hot dipped galvanized, alu-zinc coating, pre-painted, color coating, etc |
zinc coating | 60-275g/m2 |
tolerance | Thickness: +/-0.02mm Width: +/-2mm |
surface processing | Regular spangle, minimized spangle, zero spangle, bright spangle, etc |
application | Steel structure, building exterior application, building material, roofing household, application, tube making, etc… |
product feature | Good performance, high precise, high straightness, high evenness and surface finishing, uniform thickness, easy for coating process, high tensile strength, high pressing property and low yield point |
package | Wrapped with waterproof paper inside, galvanized steel covered, tied by steel strip, supported by pallet, then loaded in container or according to customer’ requirements |
delivery | Normally 7-10 days after get deposits or according to the quantity |
Our Services
• Your inquiry related to our product & price will be replied within 24hours.
• Well-trained & experienced staff are to answer all your inquiries professional
in English of course.
• OEM is highly welcomed. We have strong R&D team here to help.
• Your business relationship with us will be confidential to any third party.
• Good after-sale service offered, please get back if you got question
Faq
Q1: Are you a factory or trading company?
A: We are an enterprise of both professional production and large sales.
Q2: Can I get some samples?
A: Yes, we are honored to supply you free samples of steel tube.
Q3: What about your payment term?
a) T/T: 30% T/T advance, 70% balance copy of B/L
b) L/C
c) T/T and L/C: 40% T/T advance, 60% L/C
d)Two sides deliberations
Q4: What about the lead time for mass production?
A:Honestly, it depends on the order quantity and specification and the season you place the order.
Q5: What is your terms of delivery?
A:We accept EXW,FOB,CFR,CIF,etc. You can choose the one which is the most convenient or cost effective for you.