New construction material zinc coating jis g 3321 shearline steel strip weight chart
USD $300 - $800 /Ton
Min.Order:5 Tons
Tianjin TF Steel Pipe Co., Ltd.
Prime quality regular spangle jis g 3316 shearline steel strip packaging
Best quality large spangle jis g 3313 shearline steel strip company
Imports from china regular spangle jis g 3302 shearline steel strip made in china
Soft black zinc coated jis g 3141 shearline steel strip price list
Prime quality zinc coating jis g 3106 shearline steel strip packaging
commodity | galvanized steel coil |
width | 600-1500mm |
thickness | 0.12-5mm |
standard | JIS G 3302-1998, ASTMA653M, GB/T 2518, Q/CHG3-2005, EN 10142, DX51D,ENG10142,SGCD(DX52D+Z) |
coil weight | 3-8tons (Can be customized) |
technique | Hot dipped galvanized, alu-zinc coating, pre-painted, color coating, etc |
zinc coating | 60-275g/m2 |
tolerance | Thickness: +/-0.02mm Width: +/-2mm |
surface processing | Regular spangle, minimized spangle, zero spangle, bright spangle, etc |
application | Steel structure, building exterior application, building material, roofing household, application, tube making, etc… |
product feature | Good performance, high precise, high straightness, high evenness and surface finishing, uniform thickness, easy for coating process, high tensile strength, high pressing property and low yield point |
package | Wrapped with waterproof paper inside, galvanized steel covered, tied by steel strip, supported by pallet, then loaded in container or according to customer’ requirements |
delivery | Normally 7-10 days after get deposits or according to the quantity |
Our Services
• Your inquiry related to our product & price will be replied within 24hours.
• Well-trained & experienced staff are to answer all your inquiries professional
in English of course.
• OEM is highly welcomed. We have strong R&D team here to help.
• Your business relationship with us will be confidential to any third party.
• Good after-sale service offered, please get back if you got question
Faq
Q1: Are you a factory or trading company?
A: We are an enterprise of both professional production and large sales.
Q2: Can I get some samples?
A: Yes, we are honored to supply you free samples of steel tube.
Q3: What about your payment term?
a) T/T: 30% T/T advance, 70% balance copy of B/L
b) L/C
c) T/T and L/C: 40% T/T advance, 60% L/C
d)Two sides deliberations
Q4: What about the lead time for mass production?
A:Honestly, it depends on the order quantity and specification and the season you place the order.
Q5: What is your terms of delivery?
A:We accept EXW,FOB,CFR,CIF,etc. You can choose the one which is the most convenient or cost effective for you.