Stable Structure Belt Conveying With Best Quality
USD $2,000 - $5,000 /Set
Min.Order:1 Set
Henan Kexing Heavy Industry Co., Ltd.
Stable Structure Belt Conveyor With Best Quality
Belt Conveyor brief introduction
The belt conveyor produced by our company has the strongpoints of large conveying amount, simple structure, easy maintenance, high standardization degree, etc, which is widely used in mining, metallurgy, coal and other industries. The belt conveyor can be used to transfer bulk materials or materials in pieces.According to different transferring requirements, the transferring system can be of only one belt conveyor or consists of several conveyors, or combined with other transferring equipments. The belt conveyor can be installed horizontally or aslope to meet the needs of different transferring requirements.
Working principle
The motor drives the driving rollers of the belt conveyor, and drives the roller by the strong belt advances. Materials are conveyed from the original place to the place where they are needed.
Technical parameter
Belt Width(mm) | Belt Length (m) / Power (kw) | Belt Speed (m/s) | Capacity (t/h) | ||
500 | ≤12/3 | 12-20/4-5.5 | 20-30/5.5-7.5 | 1.3-1.6 | 45-100 |
650 | ≤12/4 | 12-20/5.5 | 20-30/7.5-11 | 1.3-1.6 | 70-120 |
800 | ≤10/4 | 10-15/5.5 | 15-30/7.5-15 | 1.3-1.6 | 120-180 |
1000 | ≤10/5.5 | 10-20/7.5-11 | 20-40/11-22 | 1.3-2.0 | 160-250 |
1200 | ≤10/7.5 | 10-20/11 | 20-40/15-30 | 1.3-2.0 | 200-400 |
Note: This specification is just reference, any changes are subject to the products.
Notes during using
1.Please read operation manual carefully before use.the machine may only be operated by fully authorized,trained personnel.
2.Make sure that the machine starts without any load. The machine can only be started after.All people are away from it and wear safety helmet and pay attention to flying stones,please stand outside the safe distance.
3.when machine running. All adjustment,clearance or check-up is strictly prohibited keep away from any running part. Overladed operation is strictly prohibited.
4.Maintain the machine timely. Before halt for check,feeder should be first stopped feeding and make sure the stones are all out of the machine silo.
Our Services
Per-sale:
(1) According to customer's special requirements, design and manufacture of products.(2) the company free of charge to the user onsite engineering and technical personnel planning site for the user to design the best processes and programs
Sale:
(1) product acceptance.
(2) to help customers develop construction programs.
After-sale:
(1) free to assign a dedicated service personnel, arrived at the scene and guide customers installation.
(2) equipment installation.
(3)complete sets of equipment installed.
Our certificates
Cooperation with foreign customers
Order Online:
If you interested in the products, please submit your requirements and contact and then we willl contact you in two days. We promise you tha all your informantions won't be leaked to anyone.