High quality Ultrafilter FF02/05 SM02/05 MF02/05
USD $10 - $12 /Piece
Min.Order:1 Piece
Xinxiang Apda Filter Co., Ltd.
Ultrafilter FF02/05 SM02/05 MF02/05
1. Aluminium alloy caps
2. PE,FF,MF,SMF,AK&P-SRF grade
3. Glassfiber media
Technical specification:
1. Equipped with o-ring
2. Replacement filter elements for Ultrafilter's compressed air filters are available for following Models: ( Ultrafilter Grades: PE, SB, FF, MF, SMF,AK, P-SRF)
Flow Nm³/min | Model |
0.16 | 02/05 |
0.5 | 03/05 |
1 | 03/10 |
1.5 | 04/10 |
2 | 04/20 |
3 | 05/20 |
4.5 | 05/25 |
6 | 07/25 |
7 | 05/30 |
8 | 07/30 |
12 | 10/30 |
18 | 15/30 |
24 | 20/30 |
32 | 30/30 |
48 | 30/50 |
Filtration rating and oil content:
Grade | Filtration rating (μm) | Oil content (ppm) |
PE | 25, 5, 1 | 5 |
SB | 50, 25, 5 |
|
FF | 0.01 | 1 |
MF | 0.01 | 0.03 |
SMF | 0.01 | 0.01 |
AK | 0.01 | 0.003 |
|
|
Our company compressor filter OEM series : |
Atlas copco filter OEM series |
Ingersoll rand filter OEM series |
Sullair filter OEM series |
Compair filter OEM series |
Kaeser filter OEM series |
Mann filter OEM series |
Fu sheng filter OEM series |
Kobelco filter OEM series |
Hitachi filter OEM series |
Our company hydraulic filter OEM series : |
Hydac filter OEM series |
Pall filter OEM series |
Fleetguard filter OEM series |
Parker filter OEM series |
MP FILTRI OEM series |
Our company in-line filter OEM series |
atlas copco inliner filter OEM series |
Ingersoll rand inline filter OEM series |
Ultrafilter OEM series |
Dominic handler filter series |
Zander filter series |
Kaeser inline filter OEM series . |
Our company vacuum pump filter OEM series |
Becker vacuum pump filter OEM series |
Busch vacuum pump filter OEM series |
Leybold vacuum pump filter OEM series |
Rietschle vacuum pump filter OEM series |
1.Price: All prices and terms are quoted in US Dollar under FOB qingdao or CIF your country port , and the price available for 1 months.
2. Minimum Order Quantity: Each item has a minimum order quantity, which would be stated in our quote sheet. Assorted items would be negotiable
3.Delivery Lead Time: If there have stocks, the lead time is about one week after we get the payment, if need producing ,7 days after we get the prepay upon request.
4. Payment Terms: T/T , Paypal and Escrow .